Machine Studies

Draft Schedule for Run02-2, 2014

June 3rd 0800 - June 4th 0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, June 03, 2014

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

RF waveguide switch to RF3

RF Group

No Beam

0930-1130

Troubleshoot iocs1bpm

Lenkszus

No Beam

0930-1030

Replace MF100 module in iocs23fb

Laird

No Beam

 

 

 

 

1000-1200

Troubleshoot S2 VV02

Martens

Access Zone A

1030-1100

Remove ceramic vacuum chamber

MOM group

Access Booster

1200-1600

Troubleshoot RF5 output power fluctuations

RF Group

Limited Injection

1100-1230

PAR training (09-15)

Frausto

Limited Injection

1230-1430

Evaluate RF3 with beam loading

RF Group

Stored Beam & Injection

1330-1430

Steer and Center on the S27ID2 intensity monitor

Sereno

Stored Beam & Injection

1430-1730

Shielding verification of 27-ID-A and 35-ID-E

Ramanathan

20-50 mA stored beam

1430-1730

RFGun One beam operations and file renewal

Pasky

Limited Injection

1730-1930

Test updated software in iocpar01

Pietryla

Limited Injection

1930-2130

Test MXA-basd tune and chromaticity measurement. 24 single and 324 fill pattern

Yao/Shang

Stored Beam & Injection

2130-2330

Setup and test  booster IRamp configuration with beam

Yao/Shange

Stored Beam & Injection

2300-0000

Test separation of spatial modes when running  RTFB and datapool

Emery/Sereno

Stored Beam & Injection

 

Wednesday, June 04, 2014

 

 

0000-0400

Test separation of spatial modes when running  RTFB and datapool

Emery/Sereno

Stored Beam & Injection

0400-0700

BPM offset measurement (P1)

OPS

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection