Machine Studies
Draft Schedule for Run02-2, 2014
June 3rd 0800 - June 4th 0800
Time | Descriptions | Studiers | SR Status |
| Tuesday, June 03, 2014 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
0930-1000 | RF waveguide switch to RF3 | RF Group | No Beam |
0930-1130 | Troubleshoot iocs1bpm | Lenkszus | No Beam |
0930-1030 | Replace MF100 module in iocs23fb | Laird | No Beam |
|
|
|
|
1000-1200 | Troubleshoot S2 VV02 | Martens | Access Zone A |
1030-1100 | Remove ceramic vacuum chamber | MOM group | Access Booster |
1200-1600 | Troubleshoot RF5 output power fluctuations | RF Group | Limited Injection |
1100-1230 | PAR training (09-15) | Frausto | Limited Injection |
1230-1430 | Evaluate RF3 with beam loading | RF Group | Stored Beam & Injection |
1330-1430 | Steer and Center on the S27ID2 intensity monitor | Sereno | Stored Beam & Injection |
1430-1730 | Shielding verification of 27-ID-A and 35-ID-E | Ramanathan | 20-50 mA stored beam |
1430-1730 | RFGun One beam operations and file renewal | Pasky | Limited Injection |
1730-1930 | Test updated software in iocpar01 | Pietryla | Limited Injection |
1930-2130 | Test MXA-basd tune and chromaticity measurement. 24 single and 324 fill pattern | Yao/Shang | Stored Beam & Injection |
2130-2330 | Setup and test booster IRamp configuration with beam | Yao/Shange | Stored Beam & Injection |
2300-0000 | Test separation of spatial modes when running RTFB and datapool | Emery/Sereno | Stored Beam & Injection |
| Wednesday, June 04, 2014 |
|
|
0000-0400 | Test separation of spatial modes when running RTFB and datapool | Emery/Sereno | Stored Beam & Injection |
0400-0700 | BPM offset measurement (P1) | OPS | Stored Beam & Injection |
0700-0800 | Prepare for User beam | OPS | Stored Beam & Injection |