Machine Studies
Draft Schedule for Run02-3, 2014
June 10th 0800 - June 11th 0800
Time | Descriptions | Studiers | SR Status |
| Tuesday, June 10, 2014 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
1000-1600 | Remove grid XBPM at 27ID | Ramanathan | Access Zone D |
0930-1030 | Test EPICS release for L6 | DiMonte | No Beam |
0930-1030 | Troubleshoot S34B:P2 | Bui | No Beam |
1030-1230 | Troubleshoot BPS100s' P0 sync faults in sectors 19 and 20 | Bui | No Beam |
0930-1030 | Replace HX filter on vacuum chamber cooling water skid | Swetin | No Beam |
0930-1130 | Repair interface board for IEX | Deriy | No Beam |
0930-1130 | Swap out Zone quadrupoles | Vargas | No Beam |
0930-1130 | Collect external converter signals S36/37 | Wang | No Beam |
0930-1130 | Pinger test | Wang | No Beam |
0930-1130 | Collect external kicker signals | Vanis | No Beam |
0930-1130 | Test EPICS release for iocs1bpm | Xu | No Beam |
0930-1330 | Replace rack temp regulation electronics | Erwin | No Beam |
0930-1600 | Replace klystron at RF-3 | RF Group | No Beam |
1330-1600 | Test IEX Control New Features | Smith | No Beam |
1600-1900 | Test a booster ramp script and energy saving mode | Yao/Shang | Limited Injection |
1600-2000 | IEX run at 400 eV | Xiao | Stored Beam & Occasional Injection |
2000-2400 | Test separation of spatial modes when running RTFB and datapool | Emery/Sereno | Stored Beam & Injection |
| Wednesday, June 11, 2014 |
|
|
0000-0400 | Skew Quad Commissioning | Sajaev | Stored Beam & Injection |
0400-0600 | SR training (23-07) | Angel | Stored Beam & Injection |
0700-0800 | Prepare for User beam | OPS | Stored Beam & Injection |