Machine Studies
Draft Schedule for Run02-4, 2014
June 17th 0800 - June 18th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 17, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1200 |
Replace rack temp regulation electronics |
Blake |
No Beam |
0830-1230 |
Reinstall grid BPM at 27ID |
Ramanathan |
Access Zone D |
0830-0900 |
Waveguide switch to RF-3 |
RF Group |
No Beam |
0845-1230 |
Swap ID at 35ID |
Grimmer |
Access Zone E & F |
0900-1000 |
Download updated PLC code for the LNDS D Module (will cause drop valve closure for this module + alarm handler disabled for this module) |
M. Smith |
No impact |
0900-1000 |
Switch back to primary pump SR16A (513) -- not bumpless (all supplies + raws off in 14,15,16,17) |
Wright |
No Beam |
0900-1000 |
Switch back to primary pump SR-IW-SY-A -- not bumpless (RF5, Booster P.S., Inj. pulsed supplies, PTB p.s. off) |
Wright |
No beam |
0930-1130 |
Vibration measurements in gun area |
Pasky |
Access Linac |
0900-1100 |
Swap out old quads in S6 & S12 |
Vargas |
No Beam |
1300-1400 |
S35 BPLD validations |
Erwin |
Stored Beam & Injection |
1400-1700 |
Troubleshoot RF-3 LLRF (parasitic) |
Berenc |
Stored Beam & Injection |
1400-1500 |
SR training (07-15) |
Angel |
Stored Beam & Injection |
1500-1700 |
PAR training (15-23) |
Frausto |
Limited Injection |
1500-1700 |
Test tune measurement script with an Agilent loaner generator and MXA |
Yao/Shang |
Limited Injection |
1700-2100 |
Unified orbit feedback studies |
Sereno/Emery/ Carwardine/ Arnold |
Stored Beam & Injection |
2100-2400 |
Mombo gap Scans |
Sereno |
Stored Beam & Injection |
|
Wednesday, June 18, 2014 |
|
|
0000-0200 |
Mombo gap Scans |
Sereno |
Stored Beam & Injection |
0200-0400 |
Open |
|
|
0400-0700 |
SCU0 BLM studies |
Harkay/Dooling |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |