Machine Studies

Draft Schedule for Run02-6, 2014

July 4th 0800 - July 8th 0800

 

Time

Descriptions

Studiers

SR Status

 

Friday, July 4, 2014

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Open

 

 

0900-1500

BPM offset measurement (P1, sector 1 to 20)

OPS

Stored Beam & Injection

1500-1700

Storage Ring Operator Training (1500-2300)

Angel

Stored Beam & Injection

1700-2300

BPM offset measurement (P1, sector 21 to 40)

OPS

Stored Beam & Injection

2300-2400

BPM offset measurement (P5, sector 1 to 40)

OPS

Stored Beam & Injection

 

Saturday, July 5, 2014

 

 

0000-0500

BPM offset measurement (P5, sector 1 to 40)

OPS

Stored Beam & Injection

0500-1100

Open

 

 

1100-1300

Storage Ring Operator Training (1100-2300)

Angel

Stored Beam & Injection

1300-1700

Injection kickers+ID6 BLM study

Harkay

Stored Beam & Injection

1700-2300

IK5 pinger collective effects studies

Harkay

Stored Beam & Injection

2300-2400

BPM offset measurement (P2, sector 1 to 20)

OPS

Stored Beam & Injection

 

Sunday, July 6, 2014

 

 

0000-0500

BPM offset measurement (P2, sector 1 to 20)

OPS

Stored Beam & Injection

0500-0800

Open

 

 

0800-1400

Booster non-linear bump optimization

Yao

Limited Injection

1400-1600

Test SR chromaticity measurement script

Yao

Stored Beam & Injection

1600-1800

Storage Ring Operator Training (1100-2300)

Angel

Stored Beam & Injection

1800-2400

IEX run at 400 eV

 

 

 

Monday, July 7, 2014

 

 

0000-0600

BPM offset measurement (P2, sector 21 to 40)

OPS

Stored Beam & Injection

0600-0700

check out some code modifications
to the CPU in sector 4

M. Smith

No beam

0700-0800

Investigate global open/close functions for the SCU and IEX

M. Smith

No beam

0730-0800

Prepare for Linac/PAR access

OPS

No injection

0800-1000

take measurements for cable length estimates in preparation for the new PC gun installation

Erwin

Linac/PAR Access

0800-1130

Investigate possible BPLD problem at 30-ID (31A:P1 suspect)

Erwin/ Brill

No beam

0800-1000

Install breakers and connect wiring to ( TRP-J17 and L2:EL:S01) AC power panel

Pasky

No injection

0800-1200

Investigation an intermittent problem in the klystron drive system at RF3

RF Group

No beam

0800-1200

Install a quasi-permanent load in place of the 2kW attenuator presently installed as a harmonic damper load

RF Group

No beam

0800-1000

take scope pictures for the Booster Septum’s and Kickers power supply

Geotzen/ Vargas

No injection

0800-1000

Take external measurements on fast correctors in sector 36:37

J. Wang

No beam

0800-1000

Replace blown filter fuses in the fast correctors in Sectors 1, 25, 26, 31 and 38

Puttkammer

No beam

0800-0900

Return to primary pump 513 & 517 (P.S. in S14 through 21 set to zero)

Wright

No beam

0900-1100

IEX PS Study

Deriy/Smith

No beam

0900-1100

Injection kickers + MPS test

Harkay/Lenkszus/Laird

No beam

1100-1200

IK5 peak voltage and timing adjustment

Harkay/J. Wang

No beam

1000-1200

PAR training

Frausto

Limited injection

1000-1200

Swap out old Quad converters in Zone A

Vargas

No beam

1200-1300

30-ID BPLD validation

Erwin

Stored beam & injection

1300-1500

Confirm repairs on RF3 with beam loading (any study maintaining approximately 100mA can be parasitic)

RF Group

Stored beam & injection

1300-1500

Storage ring training (0700-1500) - Stored beam only

Obasohan

Stored beam & injection

1500-2100

Injection kickers+MPS studies

Harkay/Dooling

Stored beam & injection

2100-2400

IEX run at 400 eV

Xiao

Stored beam & injection

 

Tuesday, July 8, 2014

 

 

0000-0300

IEX run at 400 eV

Xiao

Stored Beam & Injection

0300-0630

Open

 

 

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection