Machine Studies
Draft Schedule for Run02-8, 2014
July 14th 0800 - July 16th 0800
Time | Descriptions | Studiers | SR Status |
| Monday, July 14, 2014 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
0930-1000 | 13ID end to end test | Budz | No Beam |
0930-1030 | Reboot iocsbpmdp, iocs40fb | Xu | No Beam |
0930-1130 | Swap out old quad converters | Vargas | No Beam |
0930-1130 | Troubleshoot S5A:V2 | Puttkammer | No Beam |
0930-1130 | Investigate SR sector 38:39 communication glitches | Jordan | No Beam |
0930-1130 | Retake injector pulsed supply scope images | Goetzen | Beam @Injector |
0930-1130 | IEX PS Interlock Test | Deriy/Smith | No Beam |
1000-1100 | Replace blower at S37 Cavity #1 | Morrison | Access Zone F |
1000-1100 | Troubleshoot PW pump 301 return pumps 513 and 517 to lead status | Wright | No Beam |
1030-1100 | Map DI water lines for SCU1 | Wright | Access Zone A |
1130-1200 | SR recover from access | Ops | Stored Beam & Injection |
1200-1300 | Setup P0 feedback | Yao/Sajaev | Stored Beam & Injection |
1300-1700 | Setup RHB Lattice | Sajaev | Stored Beam & Injection |
1700-2100 | Unified Feedback Studies | Sereno/Emery/Carwardine | Stored Beam & Injection |
2100-2400 | Orbit Switch | Xiao | Stored Beam & Injection |
| Tuesday, July 15, 2014 |
|
|
0000-0100 | Orbit Switch | Xiao | Stored Beam & Injection |
0100-0800 | BPM offset measurement | Ops/Xiao | Stored Beam & Injection |
0800-0900 | Waveguide switch to run RF-3 to the Booster | RF Group | No Beam |
0900-1000 | Test run RF-3 to the Booster | RF Group | Stored Beam & Injection |
1000-1100 | Waveguide switch to run RF-5 to the Booster | RF Group | No Beam |
1100-1300 | Test BM IRamp Update | Yao/Shang/Xu | No Beam |
1300-1500 | Test upgrade ioc | Xu | Stored Beam & Injection |
1500-1800 | Invest beam motion in various conditions | Sajaev | Stored Beam & Injection |
1800-2200 | S27 GRID xray BPM studies | Sereno | Stored Beam & Injection |
2200-2400 | Optimize Booster non-linear ramp and measure chromaticity | Yao | Limited Injection |
| Wednesday, July 16, 2014 |
|
|
0000-0100 | Optimize Booster non-linear ramp and measure chromaticity | Yao | Limited Injection |
0100-0630 | Invest beam motion in various conditions | Sajaev | Stored Beam & Injection |
0630-0800 | Prepare for User beam | OPS | Stored Beam & Injection |