Machine Studies
Draft Schedule for Run03-1, 2014
September 25th 0800 – October 1st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, September 25, 2014 |
|
|
0800-1200 |
BPLD validations |
Erwin/Keane/Hahne |
Stored beam & injection |
1200-1600 |
Initial BPM checkout |
Sereno |
Stored beam & occ. injection |
1300-1500 |
Booster training (07-15) parasitic to X-ray BPM checkout |
Frausto |
Limited Injection |
1600-2200 |
Initial lattice and injection setup (before orbit recovery) |
Sajaev |
Stored beam & injection |
2200-2300 |
PAR training (1500-2300) |
Henry |
Limited injection |
2300-2400 |
orbit recovery |
Xiao |
Stored beam & injection |
|
Friday, September 26, 2014 |
|
|
0000-0300 |
orbit recovery (continued) |
Xiao |
Stored beam & injection |
0300-0500 |
BPM offset measurements (S13-14) |
Xiao |
Stored beam & injection |
0500-0700 |
SR training (2300-0700) |
Angel |
Stored beam & injection |
0700-0900 |
Booster training |
Frausto |
Limited injection |
0730-0845 |
6-ID & 33-ID PSS End-to-End test |
Budz |
No beam |
0900-1300 |
Orbit clean-up |
Sajaev |
Stored beam & injection |
1300-1500 |
test the sr bpm ioc upgrade to new epics verstion with beam |
Xu/Emery |
Stored beam & injection |
1500-1900 |
GRID XBPM studies in sector 27 |
Sereno |
Stored beam & injection |
1900-2100 |
PAR training (1500-2300) |
Henry |
Limited injection |
2100-2400 |
CPU checkout |
Xiao |
Stored beam & injection |
|
Saturday, September 27, 2014 |
|
|
0000-0500 |
CPU checkout |
Xiao |
Stored beam & injection |
0500-0700 |
ID field Error measurement |
Xiao |
Stored beam & injection |
0700-0900 |
SR training (2300-1100) |
Angel |
Stored beam & inj. |
0900-1700 |
Unified feedback system studies |
Sereno |
Stored beam & injeciton |
1700-1900 |
PAR training (1100-2300) |
Henry |
Limited injection |
1900-2400 |
IEX checkout |
Xiao |
Stored beam & injection |
|
Sunday, September 28, 2014 |
|
|
0000-0300 |
IEX checkout (continued) |
Xiao |
Stored beam & injection |
0300-0500 |
SR training (2300-1100) |
Angel |
Stored beam & inection |
0500-0700 |
OPEN |
|
|
0700-1500 |
Unified feedback system studies |
Sereno |
Stored beam & injection |
1500-2100 |
ID30 undulator test with user (need shutters) |
Sajaev |
Stored beam & injection |
2100-2400 |
Test new skew quads |
Sajaev |
Stored beam & injection |
|
Monday, September 29, 2014 |
|
|
0000-0100 |
Test new skew quads |
Sajaev |
Stored beam & injection |
0100-0500 |
Local impedance measurement with offset |
Emery |
Stored beam & injection |
0500-0700 |
OPEN |
|
|
0700-0800 |
SR training (0700-15:30) |
Angel |
Stored beam & injection |
0800-1100 |
test booster ramp supply with 1Hz ramp cycle |
Yao/ Puttkammer |
Limited injection |
0800-0930 |
SR RF waveguide switch and RF4 phase adjustments |
RF Group |
No beam |
0930-1300 |
Mechanical motion sensing system tests (324 singlets) |
Sereno |
Stored beam & injection |
1300-1500 |
Zone F Access to repair S37 Cav 1 IR detectors |
Morrison |
No beam |
1300-1500 |
investigate the slot for 14AQ3. |
Puttkammer |
No beam |
1500-1700 |
Set-up P0 feedback |
Yao |
Stored beam & injection |
1700-2100 |
Set-up setting up S35 GRID-XBPM |
Yang |
Stored beam & injection |
2100-2400 |
ID1 beam loss monitor studies: calibration & beam dumps. Single bunch - 100 mA, 24 sing |
Harkay/ Dooling |
Stored Beam & injection |
|
Tuesday, September 30, 2014 |
|
0000-0500 |
0000-0500 |
ID1 beam loss monitor studies: calibration and beam dumps. (continued) |
Harkay/ Dooling |
Stored Beam & injection |
0500-0700 |
check SCU0 skew quad FF table |
Harkay |
Stored Beam & injection |
0700-0900 |
SR Training (07:00-15:30) |
Angel |
Stored beam & injection |
0900-1500 |
Final lattice and injection setup |
Sajaev |
Stored beam & injection |
1500-1900 |
S35 bunch purity monitor setup and pinhole camera setup for user operations, |
Yang |
Stored beam & injection |
1900-2100 |
PAR training (1500-2300) |
Henry |
Limited injection |
2100-2400 |
Mombo XRay bpm gap scan scripts |
Sereno |
Stored beam & injection |
|
Wednesday, October 1, 2014 |
|
|
0000-0600 |
Mombo XRay bpm gap scan scripts (continued) |
Sereno |
Stored beam & injection |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |