Machine Studies

Draft Schedule for Run03-1, 2014

September 25th 0800 – October 1st 0800

Time

Descriptions

Studiers

SR Status


Thursday, September 25, 2014



0800-1200

BPLD validations

Erwin/Keane/Hahne

Stored beam & injection

1200-1600

Initial BPM checkout

Sereno

Stored beam & occ. injection

1300-1500

Booster training (07-15) parasitic to X-ray BPM checkout

Frausto

Limited Injection

1600-2200

Initial lattice and injection setup (before orbit recovery)

Sajaev

Stored beam & injection

2200-2300

PAR training (1500-2300)

Henry

Limited injection

2300-2400

orbit recovery

Xiao

Stored beam & injection


Friday, September 26, 2014



0000-0300

orbit recovery (continued)

Xiao

Stored beam & injection

0300-0500

BPM offset measurements (S13-14)

Xiao

Stored beam & injection

0500-0700

SR training (2300-0700)

Angel

Stored beam & injection

0700-0900

Booster training

Frausto

Limited injection

0730-0845

6-ID & 33-ID PSS End-to-End test

Budz

No beam

0900-1300

Orbit clean-up

Sajaev

Stored beam & injection

1300-1500

test the sr bpm ioc upgrade to new epics verstion with beam

Xu/Emery

Stored beam & injection

1500-1900

GRID XBPM studies in sector 27

Sereno

Stored beam & injection

1900-2100

PAR training (1500-2300)

Henry

Limited injection

2100-2400

CPU checkout

Xiao

Stored beam & injection


Saturday, September 27, 2014



0000-0500

CPU checkout

Xiao

Stored beam & injection

0500-0700

ID field Error measurement

Xiao

Stored beam & injection

0700-0900

SR training (2300-1100)

Angel

Stored beam & inj.

0900-1700

Unified feedback system studies

Sereno

Stored beam & injeciton

1700-1900

PAR training (1100-2300)

Henry

Limited injection

1900-2400

IEX checkout

Xiao

Stored beam & injection


Sunday, September 28, 2014



0000-0300

IEX checkout (continued)

Xiao

Stored beam & injection

0300-0500

SR training (2300-1100)

Angel

Stored beam & inection

0500-0700

OPEN



0700-1500

Unified feedback system studies

Sereno

Stored beam & injection

1500-2100

ID30 undulator test with user (need shutters)

Sajaev

Stored beam & injection

2100-2400

Test new skew quads

Sajaev

Stored beam & injection


Monday, September 29, 2014



0000-0100

Test new skew quads

Sajaev

Stored beam & injection

0100-0500

Local impedance measurement with offset

Emery

Stored beam & injection

0500-0700

OPEN



0700-0800

SR training (0700-15:30)

Angel

Stored beam & injection

0800-1100

test booster ramp supply with 1Hz ramp cycle

Yao/ Puttkammer

Limited injection

0800-0930

SR RF waveguide switch and RF4 phase adjustments

RF Group

No beam

0930-1300

Mechanical motion sensing system tests (324 singlets)

Sereno

Stored beam & injection

1300-1500

Zone F Access to repair S37 Cav 1 IR detectors

Morrison

No beam

1300-1500

 investigate the slot for 14AQ3.

Puttkammer

No beam

1500-1700

Set-up P0 feedback

Yao

Stored beam & injection

1700-2100

Set-up setting up S35 GRID-XBPM

Yang

Stored beam & injection

2100-2400

ID1 beam loss monitor studies: calibration & beam dumps. Single bunch - 100 mA, 24 sing

Harkay/ Dooling

Stored Beam & injection


Tuesday, September 30, 2014


0000-0500

0000-0500

ID1 beam loss monitor studies: calibration and beam dumps. (continued)

Harkay/ Dooling

Stored Beam & injection

0500-0700

check SCU0 skew quad FF table

Harkay

Stored Beam & injection

0700-0900

SR Training (07:00-15:30)

Angel

Stored beam & injection

0900-1500

Final lattice and injection setup

Sajaev

Stored beam & injection

1500-1900

S35 bunch purity monitor setup and pinhole camera setup for user operations,

Yang

Stored beam & injection

1900-2100

PAR training (1500-2300)

Henry

Limited injection

2100-2400

Mombo XRay bpm gap scan scripts

Sereno

Stored beam & injection


Wednesday, October 1, 2014



0000-0600

Mombo XRay bpm gap scan scripts (continued)

Sereno

Stored beam & injection

0630-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection