Machine Studies

Draft Schedule for Run03-2, 2014

October 7th 0800 – October 8th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, October 7, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Switch from back up to pump 513/514

Wright

Affected PS at zero

0930-1000

Visually check wiring in S35 ASIE

Forrestal

Stored Beam & Injection

0930-1030

Replace DAS DSP in iocs1fb

Lenkszus

No beam

0930-1030

Install GridXbpm software S27 &35

Lenkszus

No Beam

1030-1330

Waveguide switch to RF-1 and make adjustments to RF1

RF Group

No Beam

0930-1030

Investigate the Booster Extraction interlock PLC

DiMonte/RF Group

No Injection

0930-1130

Replace SAMMS unit on starter for process water pump 509 (P-509, P-510 off)

Kailus

Affected power supplies off

0930-1130

Repair MCC bucket for AHU 5009 (P-517, P-518 off)

Kailus

Affected power supplies off

0930-1130

Replace S14 interface board

Vargas

No Beam

0930-1130

Repair ground fault in S26/27 R2

Jordan

No Beam

0930-1330

Verify PC gun connections and comm

T. Smith

Limited Injection

1000-1030

Linac bucking coil polarity check

Sun

Access Linac

1330-1530

Check out adjustments to RF-1 at 102mA (top-up needed)

RF Group

Stored beam & injection

1530-1800

check P0 feedback and measure accumulation limit

Yao

Stored beam & injection

1530-1800

Investigate on-going injection problem



1800-2100

Mombo scans

Sereno

Stored beam & injection

2100-2300

Booster training (15-23)

Frausto

Limited Injection

2300-2400

correct beta functions in the linac

Sun, Y./Dooling

Limited Injection


Wednesday, October 8, 2014



0000-0200

correct beta functions in the linac



0200-0500

ID1 BLM studies

Harkay/Dooling

Stored beam & injection

0500-0700

PAR training (23-07)

Henry

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection