Machine Studies

Draft Schedule for Run03-3, 2014

October 14th 0800 - October 15th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, October 14, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0930-1000

Reboot interleaving DSPs

PS Group

No Injection

0930-1530

pull cables from the Linac power supply rack into the ITS test room

Hillman

No impact

0930-1030

Install and test gridXbpm databases in iocs27fb and iocs35fb

Lenkszus

No Beam

0930-1030

Swap dsp boards between IOCS5FB and IOCS3FB

Laird

No Beam

0930-1130

IEX run with Quasi on

Xiao

No beam

0930-1030

RF waveguide switch to RF-1

RF Group

No Beam

1030-1130

Investigate BSP-100 loss of event receiver time -- may need to reboot iocmtime and/or all BSP100s (all iocsxxabpm & iocsxxbbpm)

Laird/Lenkszus

No beam

1030-1130

Reboot all SR & Booster RF related IOCs that have PLCs connected - see work req #34311 for list

DiMonte

No beam

0930-1130

Verify S35 ASIE wiring

Forrestal

No Impact

0930-1130

Replace interface board for S14A:Q3

Vargas

No Beam

0930-1130

Replace GESPAC in sector 38, cabinet, cabinet 1

Fors

No Beam

0930-1130

Air handler upgrades

Erwin/FMS

No Beam

0930-1130

Troubleshoot S40B:P5

Bui

No Beam

0945-1130

Leak check He transport line

Martens

Access Linac

1015-1115

Move the beam loss monitor in S1 from the upstream ID to the downstream ID

Grimmer

Access Zone A

1015-1115

Remove Cerenkov detectors in S4

Dooling/Brill

Access Zone A

1130-1200

recover and store beam

OPS

Stored beam & injection

1200-1400

look into the RMD for L2:SC3:HZ:PS

Donkers

No injection

1200-1500

S27 and S35 GRID-XBPM studies

Yang

Stored beam

1400-1500

PAR training (09-15)

Henry

Limited Injection

1500-1700

RF1 test for stability

RF Group

Stored beam & injection

1700-2000

continue investigate instability at nominal chromaticity

Emery/Yao

Stored beam & injection

2000-2300

Mombo Scans

Sereno

Stored beam & injection

2300-2400

Unified Feedback studies

Sereno

Stored beam & injection


Wednesday, October 15, 2014



0000-0200

Unified Feedback studies

Sereno

Stored beam & injection

0200-0600

high coupling injection

Xiao

Stored beam & injection

0600-0700

Booster training (23-07)

Frausto

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection