Machine Studies

Draft Schedule for Run03-5, 2014

October 28th 0800 - October 29th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, October 28, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-0930

Check strength of quadrupole glitch which will cause partial beam loss from hybrid singlet

Schroedr/ Yao

Stored Beam & injection

0930-1030

SR BPM testing

Erwin

No Beam

0930-1130

Troubleshoot S40A:Q3

Vargas

No Beam

0930-1130

Replace S14A:Q5 P.S.

Puttkammer

No Beam

0930-1130

SR AHU testing and calibration

Erwin/FMS

Stored Beam & Injection

0930-1130

Linac mode switch testing / L3 interlock test

Pasky/Pietryla

Limited/No injection

1000-1100

Remove IR camera from S37

Diag group

Access Zone F

1015-1130

Troubleshoot B1C9FL4

Wright

Access Booster

1130-1330

Set PC gun reflective trip level

Smith

No Injection

1130-1200

Recover Booster and SR

OPS

No beam

1200-1330

Investigate BTS:AV1 status error

Donkers

No Injection

1200-1300

test SR tune measurement application No beam needed

Yao, Shang

No beam

1330-1400

Verify Booster & SR beam

OPS

Stored beam & injection

1400-1600

measure booster chromaticity and making adjustment

Yao

No beam

1600-1800

K2 down beam tune up

Pasky/Grelick

Limited injection

1600-2200

S27 Libera P0 studies and GRID XBPM studies (324 singlets in hybrid lattice)

Sereno

Stored beam & occ. inj.

2200-2400

quench orbit measurement

Emery, Sajaev, Xiao

Stored beam & injection


Wednesday, October 29, 2014



0000-0400

Local impedance

Emery, Sajaev, Xiao

Stored beam & injection

0400-0600

SR training (23-07)

Angel

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection