Machine Studies
Draft Schedule for Run03-7, 2014
November 11th 0800 – November 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, November 11, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/ OPS |
Stored Beam & Injection |
0930-1000 |
RF waveguide switch |
RF Group |
No Beam |
0930-1200 |
Replace the 5kv bias cage and fiber optic "ready" cable within RF4's mod-anode tank (may need an extra hour) |
RF Group |
No Beam |
0930-1000 |
Switch back to pump 531 |
Wright |
No Beam |
0930-1030 |
Pull cables on SR mezzanine |
Diag Group |
No Impact |
0930-1130 |
Swap out quad supplies in S8/9 |
Vargas |
No Beam |
0930-1130 |
Measure Zone A water flows |
Goetzen |
No Beam |
0930-1130 |
AHU work S27/28 & S37/38 |
FMS |
No Impact |
1000-1200 |
Measure booster chromaticity |
Yao |
No Beam |
1000-1130 |
Install IR camera at 27ID |
Erwin |
Access Zone D |
1130-1200 |
Recover storage ring |
OPS |
No beam |
1200-1300 |
SR training (09-15) (may be displaced by RF Group work on 5kV bias cage if needed -- 0930-1200) |
Angel |
Stored Beam & Injection |
1300-1500 |
Set up RHB lattice |
Sajaev |
Stored beam & injection |
1500-1900 |
Orbit Switch |
Xiao |
Stored Beam & inection |
1900-2100 |
S27 Libera P0's in feedback studies |
Sereno |
Stored beam & injection |
2100-2300 |
S27, S35 GRID XBPM scans/studies |
Sereno |
Stored beam & injection |
2300-2400 |
unified feedback studies |
Sereno |
Stored beam & injection |
|
Wednesday, November 12, 2014 |
|
|
0000-0100 |
unified feedback studies (continued) |
Sereno |
Stored beam & injection |
0100-0230 |
Injector training (23-07) |
Henry |
Limited Injection |
0230-0630 |
local impedance bump |
Emery |
Stored Beam & injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |