Machine Studies
Draft Schedule for Run03-8, 2014
November 18th 0800 – November 19th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, November 18, 2014 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder/OPS |
Stored Beam & Injection |
0930-1000 |
Reboot interleaving DSPs |
PS Group |
Limited Injection |
0930-1130 |
Replace test stand klystron circulator reject load |
RF group |
No Beam or Booster Injection |
0930-1200 |
Scan 27-ID gap with no beam |
Yang |
No beam |
0930-1130 |
Swap out quads S8/9 & S15B:B4 |
Vargas |
No Beam |
0930-1130 |
Measure water flows in SR raws |
Goetzen |
No Beam |
0930-1130 |
Rewire temperature sensors |
FMS |
No Beam |
1000-1200 |
PC gun alignment/camera adjustment |
Dooling |
Access Linac |
1230-1430 |
Test RF isolation at L3 (should not affect parallel studies) |
Goel |
Injection possible |
1230-1330 |
PAR training (07-15) |
Henry |
Limited Injection |
1330-1700 |
tune slope and bunch length studies for high current/chromaticity |
Harkay/Lindberg/Yang |
Stored beam & injection |
1700-1900 |
S27 S35 gap scans |
Sereno/Yang |
Stored beam & injection |
1900-2100 |
Libera P0 studies |
Sereno |
Stored beam & injection |
2100-2400 |
IEX studes |
Xiao |
Stored beam & injection |
|
Wednesday, November 19, 2014 |
|
|
0000-0100 |
IEX studies (continued) |
Xiao |
Stored beam & injection |
0100-0500 |
High coupling studies |
Xiao |
Stored beam & injection |
0500-0700 |
Injector training (23-07) |
Frausto |
Limited Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |