Draft Schedule for Run03-9, 2014
November 27th 0000 – November 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, November 27, 2014 |
|
|
0000-0010 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0010-0230 |
BM-6 steering and SCU0 chamber heating/alignment -- 25 mA, 324 bunches |
Harkay |
Stored Beam & injection |
0230-0400 |
OPEN |
|
|
0400-0800 |
Touschek losses study |
Sajaev |
Stored beam & injection |
0800-1200 |
Investigate / repair RF4's cathode voltage drift |
RF Group |
No beam |
0800-1000 |
Replace control valve actuator on vacuum chamber water skid. sectors 13-14 |
MOM Group |
No beam |
1000-1200 |
Injector training (07-15) |
Henry |
Limited Injection |
1300-1800 |
high coupling study |
Xiao |
Stored beam & occ. inj. |
1800-2400 |
BPM Offset measurements |
OPS |
Stored Beam & Inj. |
|
Friday, November 28, 2014 |
|
|
0000-0700 |
BPM Offset measurements (continued) |
OPS |
Stored Beam & Inj. |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |