Machine Studies
Draft Schedule for Run01-1, 2015
January 27th 0800 – February 3rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, January 27, 2015 |
|
|
0800-1200 |
BPLD validations |
Erwin |
Stored Beam & Injection |
1200-1600 |
X-ray BPM checkout |
Hahne |
Stored Beam & Occ. Injection |
1600-2000 |
Initial BPM checkout |
Sereno |
Stored Beam & Injection |
2000-2400 |
Initial lattice and injection setup (before orbit recovery) |
Sajaev |
Stored Beam & Injection |
|
Wednesday, January 28, 2015 |
|
|
0000-0400 |
Orbit recovery |
Xiao |
Stored Beam & Injection |
0400-0600 |
Booster training (00-07) |
Henry |
Limited Injection |
0400-0800 |
BPM offset measurement |
Xiao |
Stored Beam & Injection |
0800-1000 |
SR training (07-15) |
Frausto |
Limited Injection |
1000-1200 |
PEM testing with beam |
Schroeder |
Stored Beam & Injection |
1200-1600 |
Orbit clean up |
Sajaev |
Stored Beam & Injection |
1600-1800 |
Set-up P0 feedback |
Yao |
Stored Beam & Injection |
1800-2000 |
SCU0 skew quad FF checkout |
Harkay |
Limited Injection |
2000-2400 |
Fractional Tune Scan on beam lifetime |
Sun/Emery/Shang |
Stored Beam & Injection |
|
Thursday, January 29, 2015 |
|
|
0000-0500 |
ID4 physical aperture |
Emery |
Stored Beam & Injection |
0500-1200 |
Replace RF gun 1 |
Pasky, MOM, Diag |
Access Linac |
0830-0900 |
Radiation surveys for RF systems at full power |
Vacca |
Access Zone E |
0800-1000 |
Measure water flows on SR Raw power supplies in Zone C |
Puttkammer |
No beam |
0915-1030 |
Replace air cylinder at 35BM |
Gagliano |
Access Zones E & F |
0915-1030 |
Replace IR camera in S38 RF Cav. |
McKenzie/Wright |
Access Zone F |
0915-1030 |
SR RF Waveguide switch |
Berenc |
No beam |
0930-1100 |
Inspect 4-ID vacuum chamber |
Grimmer, et al |
Access Zone A |
0900-0930 |
Adjust MPS "hard" limit to 105mA |
Flood |
No beam |
1000-1200 |
swap out the Gespac power supply crate in sector 39 cabinet 1 |
Puttkammer |
No beam |
1030-1200 |
Bring up SR RF systems and check-out |
Berenc |
No beam |
1100-1200 |
Check the external current monitoring for the SR Dipole power supply |
Puttkammer |
No beam |
1200-1800 |
Hybrid lattice setup and 20mA test |
Sajaev |
Stored Beam & Injection |
1800-2200 |
ID1 fast FO BLM response to variations in IK1 amplitude |
Dooling/ Harkay |
Stored Beam & Injection |
2200-2300 |
IK1 kick calibration measurements with BPMs |
Dooling/ Harkay |
Stored Beam & Injection |
2300-2400 |
IEX checkup |
Xiao |
Limited Injection |
|
Friday, January 30, 2015 |
|
|
0000-0600 |
IEX checkup |
Xiao |
Limited Injection |
0000-0400 |
Booster efficiency study |
Yao |
Limited Injection |
0400-0600 |
Linac training (00-07) |
Henry |
Limited Injection |
0600-1000 |
ID4 local impedance measurement |
Sajaev |
Stored Beam & Injection |
1000-1300 |
RF gun 1 connection and tuning |
Pasky, MOM |
Access Linac |
1300-1700 |
PC Gun work |
Dooling |
Access Linac |
1700-2100 |
Calibration of US and DS fast ID1 BLMs and evaluation of spatial effects |
Dooling/ Harkay |
Stored Beam & Injection |
2100-2300 |
SR training (15-23) |
Frausto |
Limited Injection |
2300-2400 |
RF Gun 1 conditioning |
OPS |
Limited injection |
|
Saturday, January 31, 2015 |
|
|
0000-0600 |
RF Gun 1 Conditioning |
OPS |
Limited Injection |
0600-0800 |
Current limit vs P0 feedback power |
Yao |
Stored Beam & Injection |
0800-1200 |
PAR vertical beam size growth study |
Yao |
Limited Injection |
1000-1800 |
CPU correction |
Xiao |
Limited Injection |
2100-2300 |
SR training (11-23) |
Frausto |
Limited Injection |
2300-2400 |
Open |
|
|
|
Sunday, February 1, 2015 |
|
|
0000-1000 |
Top-up checkout with SCU0 |
Ops |
Stored Beam & Injection |
1000-1800 |
CPU correction |
Xiao |
Limited Injection |
2100-2300 |
SR training (11-23) |
Frausto |
Limited Injection |
2300-2400 |
Open |
|
|
|
Monday, February 2, 2015 |
|
|
0000-1000 |
Top-up checkout with SCU0 |
Ops |
Stored Beam & Injection |
1000-1400 |
Setup of pinhole camera and bunch purity monitor for operations |
Yang |
Stored Beam & Injection |
1400-2000 |
GRID-XBPM calibration studies for revolver in Sector 35 |
Yang |
Stored Beam & Injection |
2000-2400 |
Final lattice and injection setup |
Sajaev |
Stored Beam & Injection |
|
Tuesday, February 38, 2015 |
|
|
0000-0200 |
ID4 field error measurement |
Xiao |
Limited Injection |
0200-0600 |
Final orbit checkup & ID corrections |
Xiao |
Stored Beam & Injection |
0630-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |