Machine Studies
Draft Schedule for Run01-10, 2015
April 7th 0800 – April 8th 0800
Time | Descriptions | Studiers | SR Status |
| Tuesday, April 7, 2015 |
|
|
0800-1000 | EAA vibration measurement study w/ shutters open | OPS, Preissner | Stored Beam & Injection |
0800-1000 | Investigate Linac SLED power dropouts | Pietryla | Limited Injection |
1000-1010 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
1010-1130 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
1130-1145 | Reset interleaving PS DSPs | Donkers | No Injection |
1130-1200 | Swap out 4284 card in iocs3fb | Lenksus | No Beam |
1130-1200 | RF waveguide switch from RF3 to RF2 | RF Group | No Beam |
1130-1330 | Swap SR Quads in S7 | Ackley | No Beam |
1200-1230 | Calibrate BTS current monitor | Keane, Yao | Access Booster |
1200-1230 | Add Tcavity target | Jansma | Access Linac |
1200-1400 | Install & test GridXbpm in iocs27fb | Lenkszus | No Beam |
1200-1400 | Add RTD’s to L2AS1 | Wright | Access Linac |
1200-1400 | Re-cable B2C6P1 with Libera electronics | Erwin | Access Booster |
1400-1700 | Libera P0 testing with beam | Sereno | Stored Beam & Injection |
1700-2000 | S27/35 GRID gap scan calibration | Sereno | Stored Beam & Injection |
2000-2100 | Test P0 feedback application | Yao/Shang | Stored Beam & Injection |
2100-2400 | Beam loss study with FPGA | Harkay/Dooling/Sajaev | Stored Beam & Injection |
| Wednesday, April 8, 2015 |
|
|
0000-0100 | Beam loss study with FPGA | Harkay/Dooling/Sajaev | Stored Beam & Injection |
0100-0400 | Investigate injection of RHB | Emery/Yipeng Sun | Stored Beam & Injection |
0400-0700 | Remeasure ID4 apertuer | Emery | Stored Beam & Injection |
0700-0800 | Prepare for User beam | OPS | Stored Beam & Injection |