Machine Studies

Draft Schedule for Run01-11, 2015

April 14th 0800 – April 15th 0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, April 14, 2015

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Swap out quad converters in S8/9

Ackley

No Beam

0930-1130

Characterize system gain for RF-12 systems

Goel

Limited or No Injection

0930-1130

Scope sector 6 GESPAC & replace if needed

Jordan

No Beam

0930-1130

Test GridXbpm software in iocs27fb

Lenkszus

No Beam

1000-1100

Take pinger magnet mounting dimensions

Putnam

Access Zone F

1130-1200

SR recovery

OPS

Stored Beam & Injection

1200-180

Libera P0 studies

Sereno

Stored Beam & Injection

1800-2100

Accumulation limit vs P0 feedback

Yao

Stored Beam & Injection

2100-2130

RM measurement

Harkay

Stored Beam & Injection

2130-2300

SR training (15-23)

Frausto

Limited Injection

2300-2400

Orbit Switch

Xiao

Stored Beam & Injection

 

Wednesday, April 15, 2015

 

 

0000-0400

Orbit Switch

Xiao

Stored Beam & Injection

0200-0400

Linac training (23-07)

E. Smith

Limited Injection

0400-0700

ID4 aperture measurement

Emery

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection