Machine Studies
Draft Schedule for Run01-2, 2015
February 10th 0800 - February 11th 0800
Time | Descriptions | Studiers | SR Status |
| Tuesday, February 10, 2015 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
0930-1030 | Set up XRDP configuration | Schroeder | Stored Beam |
0930-1030 | Update and test RF-5 PEM | RF Group/Soliday | Limited Injection |
0930-1530 | RF gun 1 conditioning | Pasky | 4 hrs No Injection 2 hrs Limited Injection |
0930-1130 | Measure RF loss between SSA and Klystron at L2/4 | Ma | No Injection |
1030-1100 | Switch over pumps 509,513;523,302 | Wright | No Beam |
1030-1130 | Check RF-2 collector interlock circuit | Berenc | No Beam |
1030-1230 | Study communications loss at RF-1 | DiMonte | No Beam |
1030-1230 | Investigate AC OI trip on SR Raw | Puttkammer | No Beam |
1030-1230 | Swap S37B:Q5 & S23B:Q4 | Vargas | No Beam |
1030-1230 | Measure water flows in Zone C | Goetzen | No Beam |
1030-1230 | Repair L1:SC3:VL read back | Donkers | No Injection |
1100-1200 | Reboot soft ioc server | Robinson | Stored Beam & Injection |
1100-1300 | Troubleshoot 29ID ion pump | Gagliano | Access Zone E |
1330-1500 | Linac training (07-15) | Smith | Limited Injection |
1330-1500 | Booster training (07-15) | Henry | Limited Injection |
1530-1600 | SR recovery | Ops | Stored Beam & Injection |
1600-1800 | SCU0 beam based alignment | Harkay | Stored Beam & Injection |
1600-1800 | Booster SD ramp tuning (parallel with SCU0) | Yao | Limited Injection |
1800-2200 | ID4 aperture scan | Emery/Xiao/Y.P.Sun | Stored Beam & Injection |
1800-2200 | Libera B+ measurements and testing with feedback (parallel with ID4 aperture scan) | Sereno | Stored Beam & Injection |
2200-2400 | Hybrid lattice setup | Sajaev/Xiao/Emery | Stored Beam & Injection |
| Wednesday, February 11 2015 |
|
|
0000-0200 | Hybrid lattice setup | Sajaev/Xiao/Emery | Stored Beam & Injection |
0200-0600 | ID4 local impedance measurement | Sajaev | Stored Beam & Injection |
0600-0700 | SR training (23-07) | Frausto | Limited Injection |
0700-0800 | Prepare for User beam | OPS | Stored Beam & Injection |