Machine Studies

Draft Schedule for Run01-2, 2015

February 10th 0800 - February 11th 0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, February 10, 2015

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Set up XRDP configuration

Schroeder

Stored Beam

0930-1030

Update and test RF-5 PEM

RF Group/Soliday

Limited Injection

0930-1530

RF gun 1 conditioning

Pasky

4 hrs No Injection

2 hrs Limited Injection

0930-1130

Measure RF loss between SSA and Klystron at L2/4

Ma

No Injection

1030-1100

Switch over pumps 509,513;523,302

Wright

No Beam

1030-1130

Check RF-2 collector interlock circuit

Berenc

No Beam

1030-1230

Study communications loss at RF-1

DiMonte

No Beam

1030-1230

Investigate AC OI trip on SR Raw

Puttkammer

No Beam

1030-1230

Swap S37B:Q5 & S23B:Q4

Vargas

No Beam

1030-1230

Measure water flows in Zone C

Goetzen

No Beam

1030-1230

Repair L1:SC3:VL read back

Donkers

No Injection

1100-1200

Reboot soft ioc server

Robinson

Stored Beam & Injection

1100-1300

Troubleshoot 29ID ion pump

Gagliano

Access Zone E

1330-1500

Linac training (07-15)

Smith

Limited Injection

1330-1500

Booster training (07-15)

Henry

Limited Injection

1530-1600

SR recovery

Ops

Stored Beam & Injection

1600-1800

SCU0 beam based alignment

Harkay

Stored Beam & Injection

1600-1800

Booster SD ramp tuning (parallel with SCU0)

Yao

Limited Injection

1800-2200

ID4 aperture scan

Emery/Xiao/Y.P.Sun

Stored Beam & Injection

1800-2200

Libera B+ measurements and testing with feedback (parallel with ID4 aperture scan)

Sereno

Stored Beam & Injection

2200-2400

Hybrid lattice setup

Sajaev/Xiao/Emery

Stored Beam & Injection

 

Wednesday, February 11 2015

 

 

0000-0200

Hybrid lattice setup

Sajaev/Xiao/Emery

Stored Beam & Injection

0200-0600

ID4 local impedance measurement

Sajaev

Stored Beam & Injection

0600-0700

SR training (23-07)

Frausto

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection