Machine Studies

Draft Schedule for Run01-7, 2015

March 17th 0800 – March 18th 0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, March 17, 2015

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Troubleshoot forward power readback for PAR RF-12 #1

RF Group

Limited Injection

0930-1200

Investigate loss of communication W/ S1 GESPAC

Puttkammer

No Beam

0930-1200

Swap S5 quads

Vargas

No Beam

0930-1200

Investigate L1:SC3:VL readback

Donkers

Limited Injection

0930-1200

RG1 beam study

Pasky

Limited Injection

0930-1200

Replace water hoses in Zone F

Goetzen

No Beam

0930-1200

Replace GESPAC in S11

Jordan

No Beam

0930-1200

Temperature regulation system work

Erwin

No Beam

1130-1200

Switch iocinjtime LIST module power

Laird

No Injection

1200-1600

4x4 feedback test in S27

Sereno

Limited Injection

1200-1600

Optimize booster 92 nm lattice

Yao

Limited Injection

1600-1700

Setup beam loss distribution using FPGA BPM

Harkay/Dooling/Shang

Stored Beam & Injection

1700-1900

Linac training (15-23)

E. Smith

Limited Injection

1700-1900

24 singlet lattice tune scan

Sun-Yipeng

/Emery

Limited Injection

1900-2100

Half integer resonance vs chromaticity

Sun-Yipeng

/Emery

Stored Beam & Injection

2100-2400

Orbit Switch to RHB

Xiao

Stored Beam & Injection

 

Wednesday, March 18, 2015

 

 

0000-0130

Orbit Switch to RHB

Xiao

Stored Beam & Injection

0130-0330

SR training (23-07)

Frausto

Limited Injection

0330-0630

Measure beam loss distribution using FPGA BPM

Harkay/Dooling

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection