Machine Pre-Studies

Schedule for Run02-0, 2015

May 21st  0800 – May 26th 0800

Time

Descriptions

Studiers

SR Status

 

Thursday, May 21, 2015

 

 

0800-1200

MPS validations, final checkout

Flood, OPS

 

1200-1400

Establish injection.

Schroeder, Sajaev

Stored Beam & Injection

1400-1500

ID1 BPLD validation

Erwin

 

1500-1700

Aperture scan, SCU1 chamber, 1-2 mA

Emery, Sajaev

Stored Beam & Injection

1700-2100

Beam-based alignment, scan beam in ID1, 24 bunches < 25 mA

Harkay

Stored Beam & Injection

1800-2000

Realign SCU1 chamber if needed (could be postponed to Tue, May 26)

Jansma et al

Access Zone A

2100-2400

Beam-based alignment, scan beam in BM1, 324 bunches < 25 mA

Harkay

Stored Beam & Injection

 

Friday, May 22, 2015

 

 

0000-1600

Rf conditioning, 115 mA, 24 bunches.  Measure x,y tunes at intervals of 5 mA. No P0 FB.

OPS

Stored Beam & Injection

1600-2000

Accumulate 100 mA, 24 bunches, SCU1 powered

Harkay, Sajaev, Dooling

Stored Beam & Injection

2000-2200

Beam dump test, SCU1 powered

Harkay, Dooling

Stored Beam & Injection

2200-2400

Quench test, SCU1 powered

Emery, Xiao, Harkay

Stored Beam & Injection

 

Saturday, May 23, 2015

 

 

2400-0200

Quench test, SCU1 powered (cont)

Emery, Xiao

Stored Beam & Injection

0200-0600

Beam perturbation and field integrals test

Sajaev

Stored Beam & Injection

0600-1600

BPM Checkout

Sereno

Stored Beam & Injection

1600-2400

Open

 

 

 

Sunday, May 24, 2015

 

 

0000-1900

Open

 

Stored Beam & Injection

1900-2400

ID1 BLM calibration

Dooling, Harkay

Stored Beam & Injection

 

Memorial Day, May 25, 2015

 

 

0000-2400

Open

 

Stored Beam & Injection

 

Tuesday, May 26, 2015

 

 

0000-0800

Open

 

Stored Beam & Injection