Machine Intervention

Draft Schedule for Run02-1, 2015

May 26th 0800 – May 27th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, May 26, 2015



0800-1300

Create Linac files/ activate RG-2

Pasky, Sun

Stored Beam & Injection

0800-1000

Install and test “Valid” PV’s for GridXbpms

Lenkszus

No Beam

0830-0930

Flip ID4 canted PM

Grimmer

Access Zone A

0800-1200

Fix valve in S26

Wright

S25-28 PS off

0800-1000

Test booster injection in DC-standby mode

Yao/Puttkammer

No beam

1000-1030

Replace module in iocmtime

Lenkszus

No Beam

1330-1530

Reinstall optics

Dooling

Access Linac (may be bumped if RFG work dictates)

1600-2000

Turn-by-turn BPM scripts and test for inclusion of S1 BPMs

Sajaev

Stored beam & injection

2000-2200

SR training (15-23)

Frausto

Limited Injection

2200-2400

OPEN




Wednesday, May 27, 2015



0000-0700

OPEN



0700-1200

BPLD validationss

Erwin

Stored Beam & Injection

1200-1500

X-ray bpm checkout

Erwin

Stored Beam & Injection

1500-1700

ID4 aperture

Emery

Stored Beam & Injection

1700-1900

ID1 aperture (more detailed than the SCU1 commissioning)

Emery

Stored Beam & Injection

1900-2300

Install non-symmetric sextupoles from Jan for regular 24 singlet running.

Emery

Stored Beam & Injection

2300-2400

optics correction, coupling correction on the above

Sajaev

Stored Beam & Injection


Thursday, May 28, 2015



0000-0300

optics correction, coupling correction on the above

Sajaev

Stored Beam & Injection

0300-0700

Orbit recovery

Xiao

Stored Beam & Injection

0700-0900

BPM offset measurement

Xiao

Stored Beam & Injection

0900-1000

Check out hardware and triggering abort kicker

Wang, Lenkzsus

No beam

1000-1200

MPS + kicker beam dumps with HP radiation measurements in S39, etc.

Harkay, Dooling, Vacca

Stored beam & injection

1200-1330

MPS rf bypass + kicker beam dumps

Harkay, Dooling, Horan

Stored beam & injection

1330-1400

restore MPS and do MPS validation.

Horan/OPS

No beam

1400-1800

PAR ion effect investigation. PAR and Booster beam

Yao, Calvey, Harkay

Occasional injection

1400-1800

Test SCU0 without beam

MD Group

No beam

1400-1800

Test SCU1 without beam

1-ID beamline

No beam

1800-2200

Check efficiency versus tune

Emery

Stored beam & injection

2200-2400

ID4 impedance by local bump

Emery

Stored beam & injection


Friday, May 29, 2015



0000-0200

ID4 impedance by local bump

Emery

Stored beam & injection

0200-0800

CPU checkout I

Xiao


0800-1300

Intermediate lattice correction

Sajaev

Stored beam & injection

1300-1700

Commission BSP100 BPs and measure response

Yao, Shang, Pietryla, Bui

Limited injection

1700-2100

measure booster charge dependent tune shift of 132 nm lattice. Booster beam.

Yao

Stored beam

2100-2400

DC-mode booster beam test. Booster injection only

Yao

Stored beam


Saturday, May 30, 2015



0000-0200

Storage ring training (Frausto)

Frausto

Stored beam & injection

0200-0800

Test of Compton X-ray BPMs at 24-ID (shutter open)

Yang

Stored beam & injection

0800-1200

more detailed injection efficiency

Emery

Stored beam & injection

1200-1800

CPU checkout II

Xiao

Stored beam

1800-2200

X-ray BPM checkout

Erwin

Stored beam & injection

2200-2400

Top-up Verification

OPS

Stored beam & injection


Sunday, May 31, 2015



0000-0800

Top-up Verification

OPS

Stored beam & injection

0800-1000

Storage ring training (2300-1100)

Frausto

Stored beam & injection

1000-1800

IEX checkout

Xiao

Stored beam

1800-2400

BPM offset measurements (or Top-up Verification if needed)

OPS

Stored beam & injection


Monday, June 1, 2015



0000-0500

BPM offset measurements (or Top-up Verification if needed)

OPS

Stored beam & injection

0500-0700

Storage-ring training

Frausto

Stored beam & injection

0700-1000

PAR radiation survey with 1 nC charge. PAR beam

Yao, Vacca

No injection

0800-1000

Continuation of IOCs36cav hang-up issues

Di Monte

No beam

1000-1800

ID-1 & SCU1 checkout with 1-ID beamline (shutter permit needed)

Emery, OPS, 1-ID

Stored beam & injection

1800-2000

SCU0 feedforward check-out

Harkay

Stored beam & injection

2000-2200

Final S35-BM pinhole camera set-up

Yang

Stored beam & injection

2200-2400

Bunch purity set-up

Yang

Stored beam & injection


Tuesday, June 2, 2015



0000-0500

Final lattice set-up

Sajaev

Stored beam & injection

0630-0800

Prepare for User operations

OPS

Stored beam & injection