Draft Schedule for Run02-10, 2015
August 11th 0800 – Augst 12th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 11, 2015 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0810-0910 |
test beam operations with 8 vertical booster corrector set to zero ramp |
Yao |
Stored Beam & Injection |
0930-1130 |
Re-integrate LTP BESOCM for 1Hz |
Belcher |
No Linac ACIS |
0930-1130 |
Troubleshoot cause of diode protection card failure in Booster extraction septum |
Goetzen |
No Beam |
0930-1130 |
Zone F Thermal Scan |
Puttkammer |
No Beam |
0930-1030 |
SR Waveguide Switch from RF2 to RF3 |
RF Group |
No beam |
1130-1200 |
Recover systems |
OPS |
|
1200-1600 |
Test Booster DC Ramp s |
Yao, Shang |
No injection |
1600-2000 |
Compton XBPM Studies (Shutter permit needed) |
Yang |
Stored beam & injection |
2000-2400 |
MOMBO Scans |
Sereno/Hahne |
Stored beam & injection |
|
Wednesday August 12, 2015 |
|
|
0000-0200 |
MOMBO Scans (continued) |
Sereno/Hahne |
Stored beam & injection |
0200-0400 |
OPEN |
|
|
0400-0700 |
Lifetime measurements for different chromaticities |
Yipeng Sun |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |