Machine Studies

Draft Schedule for Run02-10, 2015

August 11th 0800 – Augst 12th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, August 11, 2015



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0810-0910

test beam operations with 8 vertical booster corrector set to zero ramp

Yao

Stored Beam & Injection

0930-1130

Re-integrate LTP BESOCM for 1Hz

Belcher

No Linac ACIS

0930-1130

Troubleshoot cause of diode protection card failure in Booster extraction septum

Goetzen

No Beam

0930-1130

Zone F Thermal Scan

Puttkammer

No Beam

0930-1030

SR Waveguide Switch from RF2 to RF3

RF Group

No beam

1130-1200

Recover systems

OPS


1200-1600

Test Booster DC Ramp s

Yao, Shang

No injection

1600-2000

Compton XBPM Studies (Shutter permit needed)

Yang

Stored beam & injection

2000-2400

MOMBO Scans

Sereno/Hahne

Stored beam & injection


Wednesday August 12, 2015



0000-0200

MOMBO Scans (continued)

Sereno/Hahne

Stored beam & injection

0200-0400

OPEN



0400-0700

Lifetime measurements for different chromaticities

Yipeng Sun

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection