Machine Studies
Draft Schedule for Run02-3, 2015
June 16th 0800 - June 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 16, 2015 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-0945 |
Reboot interleaving DSPs |
Donkers |
No Injection |
0930-1030 |
Test RF5 software change for ramp waveform width |
DiMonte |
No Injection |
0930-1130 |
Swap out quad converters in S10 & 32 |
Ackley |
No Beam |
0930-1130 |
Investigate BEK OV trips |
Donkers |
No Injection |
0930-1030 |
booster DC ramp standby mode script test |
Yao, Shang |
No Injection |
0930-1130 |
Troubleshoot L2WA1 water flow |
Wright |
No Injection |
0930-1130 |
Replace SR GESPACS in S37 |
Jordan |
No Beam |
0930-1130 |
Repair water leak in S23 |
Puttkammer |
No Beam |
1000-1015 |
Install Cryo module cables |
Vacca |
Access Zone F |
1000-1030 |
Check beamline components at T-cav location |
Sun |
Access Linac |
1000-1100 |
Map RGA installation |
Gagliano/ Stillwell |
Access PAR |
1000-1300 |
Work on PC Gun CIM |
Erwin |
Access Linac |
1030-1130 |
booster DC ramp standby mode script test |
Yao, Shang |
No Beam |
1045-1230 |
Test RF1 modified device support |
DiMonte |
No Beam |
1300-1500 |
SR training (07-15) |
Frausto |
Stored Beam & injection |
1500-1700 |
BSP-100 BPM test |
Yao, Shang |
Limited injection |
1500-1700 |
Tune shift measurements |
Sun, Yipeng |
Occasional injection |
|
|
|
|
1700-1900 |
correct 1st/2nd integral in SCU1 and then do gap scans for 1ID XBPMs |
Sereno, Emery |
Stored Beam & injection |
1700-1900 |
continue studies of PAR beam size and booster injection efficiency |
Calvey, Yao |
|
1900-2200 |
test GRID in S27 in feedback |
Sereno, Yang |
Stored Beam & injection |
2200-2400 |
single-bunch abort kicker studies |
Harkay, Sajaev |
Stored Beam & injection |
|
Wednesday, June 17, 2015 |
|
|
0000-0600 |
Check CPU |
Xiao |
Stored Beam & Occ. injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |