Machine Studies

Draft Schedule for Run02-3, 2015

June 16th 0800 - June 17th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, June 16, 2015



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-0945

Reboot interleaving DSPs

Donkers

No Injection

0930-1030

Test RF5 software change for ramp waveform width

DiMonte

No Injection

0930-1130

Swap out quad converters in S10 & 32

Ackley

No Beam

0930-1130

Investigate BEK OV trips

Donkers

No Injection

0930-1030

booster DC ramp standby mode script test

Yao, Shang

No Injection

0930-1130

Troubleshoot L2WA1 water flow

Wright

No Injection

0930-1130

Replace SR GESPACS in S37

Jordan

No Beam

0930-1130

Repair water leak in S23

Puttkammer

No Beam

1000-1015

Install Cryo module cables

Vacca

Access Zone F

1000-1030

Check beamline components at T-cav location

Sun

Access Linac

1000-1100

Map RGA installation

Gagliano/ Stillwell

Access PAR

1000-1300

Work on PC Gun CIM

Erwin

Access Linac

1030-1130

booster DC ramp standby mode script test

Yao, Shang

No Beam

1045-1230

Test RF1 modified device support

DiMonte

No Beam

1300-1500

SR training (07-15)

Frausto

Stored Beam & injection

1500-1700

BSP-100 BPM test

Yao, Shang

Limited injection

1500-1700

Tune shift measurements

Sun, Yipeng

Occasional injection





1700-1900

correct 1st/2nd integral in SCU1 and then do gap scans for 1ID XBPMs

Sereno, Emery

Stored Beam & injection

1700-1900

continue studies of PAR beam size and booster injection efficiency

Calvey, Yao


1900-2200

test GRID in S27 in feedback

Sereno, Yang

Stored Beam & injection

2200-2400

single-bunch abort kicker studies

Harkay, Sajaev

Stored Beam & injection


Wednesday, June 17, 2015



0000-0600

Check CPU

Xiao

Stored Beam & Occ. injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection