Machine Studies

Draft Schedule for Run02-8, 2015

July 28th 0800 - July 29th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, July 28, 2015



0800-0810

Verify change to Collect XBPM orbit data

Shang

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

Switch from L3 to L3 providing Linac

RF Group

No Injection

0930-1030

Verify changes to Restore XPBM referance gaps and 60mm gaps PEMS

Shang

No beam

0930-1130

Replace S39 GESPAC PS

Jordan

No Beam

0930-1130

Troubleshoot BTS:AV1 read back

Donkers

Limited Injection

0930-1130

Inspect output diode protection card in Booster & SR septa

Goetzen

No Beam

0930-1130

Investigate readback for SR Abort kicker

Vargas

No Beam

0930-1130

Booster RF cavity tuning range measurements

RF Group

No Injection

1000-1100

Measure cable length for Booster tune system

Yao

Access Booster

1000-1100

SCU ramping studies without beam

Kasa, Doose

No beam

1130-1200

Recover & injection storage ring

OPS

Stored beam & injection

1200-1300

SCU ramping studies with beam

Kasa, Doose

Stored beam & injection

1300-1500

Single shot (turn) Libera B+ resolution measurement

Brill, Emery

Stored beam & injection

1500-1800

PAR ion effect study

Calvey, Yao, Harkay

No injection

1800-2400

ID aperture scan

Xiao

Stored beam & injection


Wednesday July 29, 2015



0000-0400

OPEN



0400-0700

Orbits on resonances

Yipeng Sun

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection