Machine Studies
Draft Schedule for Run02-9, 2015
August 4th 0800 – Augst 5th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, August 4, 2015 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Re-integrate LTP BESOCM for 1Hz |
Belcher, Keane |
No Linac ACIS |
0930-1130 |
Inspect output diode protection card in SR septa |
Goetzen |
No Beam |
1000-1100 |
Investigate SR converter S32A:Q5 |
Puttkammer |
No beam |
1000-1100 |
Switch pump 515 (P.S. in S16-19 set to zero) to lead pump and switch 535 to backup (P.S. in S36-S39 set to zero) |
Wright |
No beam |
0930-1130 |
test the changes made to open/close gaps PEMS |
Xiao, Shang |
No beam |
1000-1030 |
Measure cable length for Booster tune system |
Yao |
Access Booster |
1000-1200 |
Measure RF tuner limit switches and stops |
RF Group |
Access Booster |
1200-1500 |
Libera single shot resolution measurements |
Brill/Sereno/ Emery |
Stored beam & injection |
1500-1800 |
booster DC ramp study |
Yao, Shang |
No injection |
1800-1900 |
Abort kicker studies |
Harkay, Dooling |
Stored beam & injection |
1900-2300 |
PAR ion effect study. |
Calvy, Harkay, Yao |
No injection |
2300-2400 |
Measure Bunch Length |
Xiao, Yang |
Stored beam & injection |
|
Wednesday August 5, 2015 |
|
|
0000-0600 |
Measure Bunch Length (continued) |
Xiao, Yang |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |