Machine Studies

Draft Schedule for Run02-9, 2015

August 4th 0800 – Augst 5th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, August 4, 2015



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Re-integrate LTP BESOCM for 1Hz

Belcher, Keane

No Linac ACIS

0930-1130

Inspect output diode protection card in SR septa

Goetzen

No Beam

1000-1100

Investigate SR converter S32A:Q5

Puttkammer

No beam

1000-1100

Switch pump 515 (P.S. in S16-19 set to zero) to lead pump and switch 535 to backup (P.S. in S36-S39 set to zero)

Wright

No beam

0930-1130

test the changes made to open/close gaps PEMS

Xiao, Shang

No beam

1000-1030

Measure cable length for Booster tune system

Yao

Access Booster

1000-1200

Measure RF tuner limit switches and stops

RF Group

Access Booster

1200-1500

Libera single shot resolution measurements

Brill/Sereno/ Emery

Stored beam & injection

1500-1800

booster DC ramp study

Yao, Shang

No injection

1800-1900

Abort kicker studies

Harkay, Dooling

Stored beam & injection

1900-2300

PAR ion effect study.

Calvy, Harkay, Yao

No injection

2300-2400

Measure Bunch Length

Xiao, Yang

Stored beam & injection


Wednesday August 5, 2015



0000-0600

Measure Bunch Length (continued)

Xiao, Yang

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection