Machine Studies
Draft Schedule for Run03-1, 2015
September 29 0800 – September 6 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, September 29, 2015 |
|
|
0800-1200 |
Initial pinhole camera setup |
Yang |
RF condition |
1600-2000 |
BPLD validations |
Erwin |
Stored Beam & Injection |
2000-2400 |
X-ray BPM checkout |
Hahne |
Stored Beam & Injection |
|
Wednesday, September 30, 2015 |
|
|
0000-0400 |
Initial lattice and injection setup |
Sajaev |
Stored Beam & Injection |
0400-0800 |
Orbit Recovery |
Xiao |
Stored Beam & Injection |
0800-1000 |
S27/28 BPM offset measurement |
Xiao |
Stored Beam & Injection |
1000-1200 |
Test CollectRFSpectrum using MXA and S4 stripline sum signal re-connected to MUX |
Harkay/Emery/Shang/Yao |
Stored Beam |
1200-1800 |
Booster beam optimization with the new corrector ramps |
Yao/Shang |
Limited Injection |
1800-2300 |
35-ID GRID-XBPM conditioning |
Yang |
Stored Beam & Injection |
2300-2400 |
CPU checkout - 1 |
Xiao |
Stored Beam & Injection |
|
Thursday, October 1, 2015 |
|
|
0000-0500 |
CPU checkout - 1 |
Xiao |
Stored Beam & Injection |
0500-0700 |
Open |
|
|
0700-0800 |
Prepare for accesses, pump switches, etc. |
OPS |
No beam |
0700-0900 |
investigate the loss of a Gespac power supply of Gespac card in SR sector 25 cabinet 4 |
Puttkammer |
No beam |
0800-0900 |
Switch to back-up pumps for 507 and 535 to repair seals on primary pumps (P.S. Sectors 8-11 and Sectors 36-39 should be set to zero |
Wright |
No beam |
0800-1000 |
Troubleshoot power supply ripple in B3C0H |
Hillman |
No beam |
0800-1200 |
Investigate why 30ID PS1 will not open. Will require Access to the Front End through the ratchet door. |
McNamara |
No beam |
0800-0900 |
RF waveguide switch |
RF Group |
No Beam |
0800-1200 |
Laser alignment |
Dooling |
Linac access |
0900-1100 |
Investigate need to run RF5 at higher reflected power than in past with no beam |
Berenc/Horan |
No beam |
1130-1200 |
Prepare for Booster access |
OPS |
No injection |
1200-1400 |
PAR radiation monitor evaluation includes Booster Access |
Yao/Vacca |
No Injection -- Booster access |
1400-1600 |
Test new booster BPMs |
Yao/Pietryla/Bui/Shang |
No Injection |
1600-2100 |
24-ID Compton XBPM study |
Yang |
Stored Beam & Injection |
2100-2400 |
CPU checkout - 2 |
Xiao |
Stored Beam & Injection |
|
Friday, October 2, 2015 |
|
|
0000-0500 |
CPU checkout - 2 |
Xiao |
Stored Beam & Injection |
0500-0800 |
Open |
|
|
0800-1200 |
Investigate need to run RF5 at higher reflected power than in past with no beam |
Berenc/Horan/ Yao |
Limited injection |
1200-1800 |
1Hz injector test |
Yao/DiMonte/Shang |
No Injection |
1800-2100 |
OPEN |
|
|
2100-2400 |
22-ID XBPM baseline studies for future upgrade |
Yang |
Stored Beam & Injection |
|
Saturday, October 3, 2015 |
|
|
0000-0100 |
22-ID XBPM baseline studies for future upgrade (continued)( |
Yang |
Stored Beam & injection |
0100-1000 |
OPEN |
|
|
1000-1800 |
IEX checkup |
Xiao |
Stored Beam & Injection |
1800-2000 |
Final orbit check out |
Xiao |
Stored Beam & Injection |
2000-2400 |
Top-up checkout |
Ops |
Stored Beam & Injection |
|
Sunday, October 4, 2015 |
|
|
0000-0800 |
Top-up checkout |
Ops |
Stored Beam & Injection |
0800-1200 |
Booster DC ramp mode test |
Yao |
No Injection |
1200-1600 |
Pinhole camera and bunch purity monitor setup for user operations |
Yang |
Stored Beam & Injection |
1600-2400 |
Open |
|
|
|
Monday, October 5, 2015 |
|
|
0000-0200 |
Open |
|
|
0200-0500 |
BBA for the SCU0 & SCU1 chambers. & SCU0 skew quad FF compensation checkout |
Harkay |
Stored beam & injection |
0500-0800 |
48 bunches instability vs HOM spectra |
Harkay |
Stored Beam & Injection |
0800-0900 |
RF waveguide switch |
RF Group |
No Beam |
0900-1100 |
Operator Qualification |
Schroeder |
Stored Beam & Injection |
1100-1400 |
ICT timing for PC Gun |
Dooling/Sun |
No Injection |
1400-1800 |
High Energy study of linac |
Sun/Pasky |
No Injection |
1800-2400 |
Final lattice and injection setup |
Sajaev |
Stored Beam & Injection |
|
Tuesday, October 6, 2015 |
|
|
0000-0600 |
Abort kicker beam dump/loss study |
Harkay/Dooling/Sajaev |
Stored Beam & Injection |
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |