Draft Schedule for Run03-2, 2015

October 13th 0800 – October 14th 0800

 

Time

Descriptions

Studiers

SR Status

 

Tuesday, October 13, 2015

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

1000-1100

Re-enable ASYNC timing for L6

Pietryla

No Injection

1000-1100

IOCS27BPM PV testing

Lenkszus

No Beam

1000-1100

14ID end to end test

Budz

No Beam

1000-1200

Replace S36 Cav. 4 blower

 

Access Zone F

1000-1200

CPU database testing

Smith

No Beam

1000-1200

Investigate L2:QM7 read back issues

Donkers

Limited Injection

1000-1200

Inspect B:ES2 PS cabinet

Goetzen

No Injection

1000-1200

Measure interlock cable on S4B:V3

Vargas

No Beam

1100-1200

Check 1 Hz timing and BM ramp

Yao/Lenkszus/Wang

No Beam

1200-1400

Measure DC ramp lattice

Yao

No Injection

1400-1500

Operator re-qualification

Fystro/Schroeder

Stored beam & Injection

1500-1600

Test changes to single gap scan PEM

Shang/Schroeder

Stored beam & Injection

1600-1700

Operator re-qualification

Bogdan/Schroeder

Stored beam & Injection

1700-1900

Investigate S32 XBPM

Hahne

Stored beam & Injection

1900-2200

Compton XBPM study

Yang/Sereno

Stored beam & Injection

2200-2400

Calibrate Libera B+  bpms

Sereno

Stored beam & Injection

 

Wednesday, October 14, 2015

 

 

0000-0100

Calibrate Libera B+  bpms

Sereno

Stored beam & Injection

0100-0500

PAR Ion study

Calvey/Yao/Harkay

No Injection

0500-0700

48-bunch instability

Harkay

Stored beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection