Machine Studies

Draft Schedule for Run03-5, 2015

November 2nd 0800 – November 4th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, November 2, 2015

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Reboot ioclic2 to remove L6 ASYNC timing

Pietryla

No Injection

0930-1030

S29 tunnel stability measurement

Erwin

IEX off

0930-1130

Repair GESPAC remote reset for S3

Vargas

No Beam

0930-1130

Swap out S13 quads

Ackley

No  Beam

0930-1130

Troubleshoot L2:QM7

Donkers

Limited Injection

0930-1130

Troubleshoot RF3 cavity controls

RF Group

Stored Beam & Injection

1130-1200

Recover SR

Ops

Stored Beam & Injection

1200-1400

Measure S35 stripline power loss

Yao/Keane

Stored Beam & Injection

1400-1500

Setup P0 for Hybrid

Yao/Sajaev

Stored Beam & Injection

1500-1800

Abort Kicker Study

Kathy/Dooling/Emery/Sajaev

Stored Beam & Injection

1800-2200

MOMBO BPM gap scan

Hahne

Stored Beam & Injection

2200-2400

Orbit Steering investigation

Emery/Shang

Stored Beam & Injection

 

Tuesday, November 3, 2015

 

 

0000-0100

Orbit Steering investigation

Emery/Shang

Stored Beam & Injection

0100-0500

Hybrid lattice setup

Sajaev

Stored Beam & Injection

0500-0900

Orbit switch

Xiao

Stored Beam & Injection

0900-1300

24 ID XBPM with User

Yang/user

Stored Beam & Injection

1300-1700

1 Hz injector study

Yao/Dimont/Shang

Limited Injection

1300-1700

Libera B+ calibration

Sereno

Limited Injection

1700-2100

PC gun beam study

SunYE/Dooling/Pasky

Linac beam only

1700-2100

27 XBPM study (Fill at the beginning)

Yang/Sereno

Fill at the beginning

2100-2400

PAR Ion Study

Calvey/Yao/Harkay

PAR beam only

 

Wednesday, November 4, 2015

 

 

0000-0100

PAR Ion Study

Calvey/Yao/Harkay

PAR beam only

0100-0200

Hybrid re-check

Xiao

Stored Beam & Injection

0200-0630

Setup new S32 RHB

Sajaev/SunYP

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection