Machine Studies
Draft Schedule for Run03-5, 2015
November 2nd 0800 – November 4th 0800
Time | Descriptions | Studiers | SR Status |
| Monday, November 2, 2015 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | Gap Scans and update IDGapFF look-up tables | Schroeder | Stored Beam & Injection |
0930-1000 | Reboot ioclic2 to remove L6 ASYNC timing | Pietryla | No Injection |
0930-1030 | S29 tunnel stability measurement | Erwin | IEX off |
0930-1130 | Repair GESPAC remote reset for S3 | Vargas | No Beam |
0930-1130 | Swap out S13 quads | Ackley | No Beam |
0930-1130 | Troubleshoot L2:QM7 | Donkers | Limited Injection |
0930-1130 | Troubleshoot RF3 cavity controls | RF Group | Stored Beam & Injection |
1130-1200 | Recover SR | Ops | Stored Beam & Injection |
1200-1400 | Measure S35 stripline power loss | Yao/Keane | Stored Beam & Injection |
1400-1500 | Setup P0 for Hybrid | Yao/Sajaev | Stored Beam & Injection |
1500-1800 | Abort Kicker Study | Kathy/Dooling/Emery/Sajaev | Stored Beam & Injection |
1800-2200 | MOMBO BPM gap scan | Hahne | Stored Beam & Injection |
2200-2400 | Orbit Steering investigation | Emery/Shang | Stored Beam & Injection |
| Tuesday, November 3, 2015 |
|
|
0000-0100 | Orbit Steering investigation | Emery/Shang | Stored Beam & Injection |
0100-0500 | Hybrid lattice setup | Sajaev | Stored Beam & Injection |
0500-0900 | Orbit switch | Xiao | Stored Beam & Injection |
0900-1300 | 24 ID XBPM with User | Yang/user | Stored Beam & Injection |
1300-1700 | 1 Hz injector study | Yao/Dimont/Shang | Limited Injection |
1300-1700 | Libera B+ calibration | Sereno | Limited Injection |
1700-2100 | PC gun beam study | SunYE/Dooling/Pasky | Linac beam only |
1700-2100 | 27 XBPM study (Fill at the beginning) | Yang/Sereno | Fill at the beginning |
2100-2400 | PAR Ion Study | Calvey/Yao/Harkay | PAR beam only |
| Wednesday, November 4, 2015 |
|
|
0000-0100 | PAR Ion Study | Calvey/Yao/Harkay | PAR beam only |
0100-0200 | Hybrid re-check | Xiao | Stored Beam & Injection |
0200-0630 | Setup new S32 RHB | Sajaev/SunYP | Stored Beam & Injection |
0630-0800 | Prepare for User beam | OPS | Stored Beam & Injection |