Machine Studies

Draft Schedule for Run01-1, 2016

January 26th 0800 – February 2nd 0800

Time

Descriptions

Studiers

SR Status


Monday, January 25, 2016 (PRE-STUDIES)



0800-1000

Set-up Booster normal ramps

Yao


1000-1200

Store first beam & MPS live tests

OPS

Stored beam & injection

1200-1300

SCU1 and SCU0 beam-based alignment (ID steering). 25 mA, 24 bunches,

Harkay

Stored beam & injection

1300--

RF Conditioning with Beam (16 hours)

OPS



Tuesday, January 26, 2016



1000-1100

Troubleshoot S33/S34 FPGA bpm readbacks

Lenkszus

no beam/stored beam

1000-1100

Swap CMPSI cables S4B:H3 and S4B:V3 and verify/make orbit adjustment

Emery, Ju Wang

No beam/stored beam

1100-1400

BPLD Validations

Erwin

Stored beam & injection

1400-1700

X-ray bpm sanity check

Hahne

Stored beam & injection

1700-2200

Bpm/feedback system checkout

Sereno

Stored beam & injection

2200-2400

Initial lattice setup

Sajaev

Stored beam & injection


Wednesday, January 27, 2016



0000-0300

Initial lattice setup (continued)

Sajaev

Stored beam & injection

0300-0800

Orbit recovery

Xiao

Stored beam & injection

0800-1200

lstudy PAR ion effects at high pressure

Calvey, Yao, Harkay

Limited injection

1200-1500

Verify sector 27 MMS calibration factor change

Sereno, Lill, Yang

Stored beam & injection

1500-1900

Injection optimization

Sajaev

Stored beam & injection

1900-2400

CPU checkup and correction I

Xiao

Stored beam


Thursday, January 28, 2016



0000-0100

CPU checkup and correction I (continued)

Xiao

Stored beam

0100-0800

PC Gun in Linac

Yin-E Sun, Dooling

Limited injection

0800-1100

BESOCM and Linac waveguide switching validation

Pietryla, Pasky

No Injection

0800-1130

Swap out Quads for the IGBT upgrade in sectors 25 and 26…

Puttkammer

No beam

0800-1200

Test Booster main ramp supplies for normal and long ramps

Yao, Puttkammer, Lenkszus

Limited injection

0800-1130

Troubleshoot CMPSI Mux card in S27 P.S. Cabinet 2

Fors

No beam

0830-1100

Correct P.S. to magnet corrections for S4B:[HV]3. Restore correct CMPSI connections

Puttkammer

Acess Zone A

0830-1100

Access into SR to place TLD's by Zone A/F gate

Vacca

Access Zone A

0830-1100

Troubleshoot 3-ID's rotary encoder

Merritt

Access Zone A

1200-1300

Verify P.S to magnet connection for S4B:[HV]3

Emery

Stored beam

1200-1400

Stored beam for measuring radiation at Zone A/F gate

Vacca

Stored beam

1300-1400

16ID shielding verification (no top-up) 100mA

Ramanathan, Vacca

Stored beam

1400-1500

Access into SR to remove TLD's by Zone A/F gate

Vacca

Access into Zone A

1500-2100

GRID Xbpm studies (S24, 27 & 35 -- no shutters open)

Sereno, Yang

Stored beam & injection

2100-2400

IEX checkup and correction I

Xiao

Stored beam & injection


Friday, January 29, 2016



0000-0300

IEX checkup and correction I (continued)

Xiao

Stored beam & injection

0300-0800

OPEN



0800-1000

Abort kicker noise studies at S38 RF

Harkay, Dooling, Horan

Stored beam & injection

1000-1400

PAR radiation survey study. (1st hour needs Booster access)

Yao, Vacca

Booster Access

1400-1800

Sector 27 Libera B+ single turn resolution measuremenr

Sereno, Yao

Stored beam & injection

1800-2000

Booster beam full coupling test

Yao, Xiao

No injection

2000-2400

CPU checkup and correction II (continued)

Xiao

Stored beam


Saturday, January 30, 2016



0000-0200

CPU checkup and correction II (continued)

Xiao

Stored beam

0200-0900

OPEN

OPS

Stored beam & injection

0900-1300

24 ID Compton XBPM studies (shutters open)

Sereno, Yang

Stored beam & injection

1300-1700

calibrate the ID4 fast loss monitor

Dooling, Harkay

Stored beam & injection

1700-2400

Top-up Verification

OPS

Stored beam & injection


Sunday, January 31, 2016



0000-0200

Top-up Verification

OPS

Storred beam & injection

0200-0800

OPEN



0800-1200

Booster long ramp study (Booster beam only)

Yao, Shang

No injection

1200-1800

study PAR ion effects at high pressure

Calvey, Yao, Harkay

Limited injection

1800-2400

IEX checkup and correction II

Xiao

Stored beam & injection


Monday, February 1, 2016



0000-0700

OPEN



0700-1200

Final Lattice Set-up

Sajaev

Stored beam & injection

1200-1400

SCU0 skew quad FF checkout

Harkay

Stored beam & injection

1400-1800

Steering test with user in sector 27 shutters open

Emery, Yang, Gog (27-ID)

Stored beam & injection

1800-2200

RG1 checkout

Yin-E Sun, Dooling

Limited injection

2200-2400

Final pinhole & bunch purity set-up

Yang

Stored beam & injection


Tuesday, February 2, 2016



0000-0200

Final pinhole & bunch purity set-up

Yang

Stored beam & injection

0200-0630

OPEN



0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection