Machine Studies

Draft Schedule for Run01-11, 2016

April 12th 0800 – April 13th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, April 12, 2016



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Swap out quad converters in S26/27

Ackley/Vargas

No Beam

0930-1130

Investigate loss of communication in S7, Cab. 4 and S8, Cab. 5

Jordan

No Beam

0930-1030

Swap out BPLD card for 30IDds

Brill

No Beam

1000-1100

Verify Booster drawings

Pasky

Access Booster

1015-1115

Check calibration on temp. sensors S19/20

Erwin

Access Zone C

1200-1300

Validate S30ID, S31ID and S32ID BPLDs

Erwin

Stored beam & injection

1300-1400

test P0 pattern scan script for 24 singlet

Yao, Shang

Stored beam & inj.

1400-1700

MOMBO Scans (24 singlets top-up)

Hahne

Stored beam & inj.

1700-2100

Sector 27 feedback testing (324 singlets)

Sereno, et al

Occasional injection

2100-2400

booster efficiency on-momentum. Require change RF frequency

Yao, Calvey

No stored beam


Wednesday, April 13, 2016



0000-0400

High beta injection optics study

Xiao

Stored beam & inj.

0400-0700

Measure ID4 local impedance

Emery/Sajaev

Stored beam & inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection