Machine Studies

Draft Schedule for Run01-13, 2016

April 27th 0000 – April 27th 2400



Time

Descriptions

Studiers

SR Status


Wednesday, April 27, 2016



0000-0020

Collect XBPM orbit data

OPS

Stored Beam & Injection

0030-0630

Powered SCU1 synchrotron radiation heating studies using vertical steering at 1BM. 24 bunches, up to 20 mA

Harkay

Stored Beam & injection

0630-0830

Thermal scans of Zone E converters

Puttkammer

No beam

0830-0900

Recover SR

OPS


0900-1200

ID4 local impedance measurements

Sajaev, Emery

Stored beam & inj.

1200-1500

BPM Sum Signal calibration

Sajaev

Stored beam & inj.

1500-1900

HSCU0 lattice study

Yipeng Sun, Sajaev

Stored beam & injection

1900-2100

Genetic algorithm test

Yipeng Sun

Stored beam

2200-2400

Gentle shutdown of SR RF and SR P.S.

OPS

No Beam