Draft Schedule for Run01-2, 2016

February 9th 0800 - February 10th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, Feburary 09, 2015



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Swap out quad converters in S36/38

Ackley/Jordan

No Beam

0930-1130

Replace CBR relay in S6:7 T4 raw

Vargas

No Beam

0930-1130

Replace +24V supply in L2 rack

Donkers

No Injection

0930-1130

Upgrade SR AK0 strobe

Vanis

No Beam

0930-1130

Investigate S8:9 communication loss

Jordan

No Beam

0930-1230

Investigate RF4 cathode regulation problem

RF Group

No Beam

0930-1230

Booster long ramp tuning

Yao

No Injection

0930-1230

Connect and validate L1/6 interlocks

Pietryla/Pasky

No Injection

1000-1200

Troubleshoot PC gun YAG lens control

Berg

Access Linac

1000-1015

Measure residual field of gun spectrometer

Sun

Access Linac

1000-1300

Survey measurements around Tcav

Smith, T.

Access Linac

1000-1100

Replace the two monopulse receivers in S27B:P2 and S27B:P3

Blake

No beam

1230-1430

Energize and test RF-1 matching transformer

RF Group

Stored Beam & Injection

1300-1330

Recover Injectors & SR

OPS

Stored Beam & injection

1330-1530

Continue RG1 set-up

Yin-E Sun, Dooling, Pasky

Limited injection

1330-1530

Investigate S27B:P2 in feedback (see if we can put it back after doing orbit transfer and gap scan)

Sereno

Stored Beam & Occ. inj.

1530-1700

Complete PAR radiation survey

Yao, Vacca

No injection

1700-1800

measure P0 feedback noise, require 24 single stored beam and change chromaticity

Yao

Stored beam & injection

1800-2200

test of helical SCU lattice

Sajaev

Stored beam & injection

2200-2400

injection/dynamic aperture measurements

Sajaev

Stored beam & injection


Wednesday, February 10, 2015



0000-0100

injection/dynamic aperture measurements (continued)

Sajaev

Stored beam & injection

0100-0700

SR injection study

Xiao

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection