Machine Studies
Draft Schedule for Run01-3, 2016
February 16th 0800 - February 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, February 16, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Switch pumps 523 & 525 |
Wright |
No Beam/Injection |
0930-1030 |
Shutdown AHU5012 for S25/26 |
Erwin/FMS |
No Beam |
0930-1030 |
Waveguide switch to RF-1 w/ MPS/ACIS validations |
RF Group/OPS |
No Beam |
0930-1030 |
Investigate WARN #443.0 : CC3 Warning |
Bombard |
No Beam |
1030-1130 |
Investigate possible problem with S33ID DS BPLD |
Brill, Erwin |
No beam |
0930-1030 |
Validate L6/ITS ACIS interface |
Pasky |
No Injection |
0930-1130 |
Booster long ramp tuning |
Yao |
No Injection |
0930-1130 |
Swap out quads in S36/38 |
Puttkammer |
No Beam |
1000-1100 |
Replace S:BM klixons in S26 |
Wright |
Access Zone D |
1130-1200 |
Validate 33ID BPLDs if necessary |
Erwin |
Stored beam & inj. |
1200-1600 |
Sector 27 4x4 test studies |
Sereno, et al |
Stored beam & occ. inj. |
1400-1600 |
setup 1Hz booster operation mode |
Yao |
Limited injection |
1600-1630 |
Waveguide switch back to RF-4 |
RF Group |
No Beam |
1630-1730 |
measure P0 feedback beam position sensitivity calibration (for noise estimate). 24-singlet 100mA stored beam |
Yao |
Stored beam |
1730-2130 |
RG1 set up |
Yin-e Sun, Dooling |
Limited injection |
2130-2400 |
injection study |
Xiao |
Stored beam & injection |
|
Wednesday, February 17, 2016 |
|
|
0000-0330 |
injection study |
Xiao |
Stored beam & injection |
0330-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |