Draft Schedule for Run01-5, 2016
February 29th 0800 – March 2nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 29, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Coupling effect on lifetime w/ users |
Emery |
Stored Beam & Injection |
0900-1200 |
Booster long ramp studies |
Yao |
Limited/No Injection |
1000-1030 |
Reboot interleaving DSPs |
PS group |
No Injection |
1000-1030 |
Add Metasys PVs |
Smith, M. |
Stored Beam & Injection |
1000-1030 |
Switch over pumps 523, 525 and 531 |
Wright |
No Beam |
1000-1200 |
Investigate 7ID scanning issues |
Smith, M. |
Stored Beam & Injection |
1000-1200 |
During studies, investigate noisy reading on S3B:P3. |
Brill |
No beam |
1000-1200 |
Swap S28:29 quads for IGBT upgrade |
Ackley |
No Beam |
1000-1200 |
Investigate Cap/OT trip in S25A:S4 |
Vargas |
No Beam |
1000-1200 |
Replace GESPAC crate in S28 cab 5 |
Jordan |
No Beam |
1000-1200 |
L2 envelop detector calibration |
Smith, T. |
No Injection |
1200-1400 |
re-measure booster charge dependent tune shift. Booster beam only |
Yao |
No injection |
1400-1800 |
Evaluating detector to measure centroid and beam size at 1 BM - Part 1 (Shutters permit needed) |
Emery, IBM |
Stored beam & injection |
1800-2300 |
set up hybrid lattice |
Sajaev |
Stored beam & injection |
2300-2400 |
Orbit switch |
Xiao |
Stored beam & injection |
|
Tuesday, March 1, 2016 |
|
|
0000-0300 |
Orbit switch (continued) |
Xiao |
Stored beam & injection |
0300-0500 |
Measure offset for 12B:P1 and S27B:P2 |
Xiao |
Stored beam |
0300-0700 |
PC Gun studies |
Yine Sun, Dooling |
No injection |
0700-1100 |
linac beam and rf power studies |
Pasky, Yine Sun |
Limited injection |
0900-1100 |
Automatic steering debugging |
Shang, M. Smith |
No beam |
1100-1300 |
Automatic steering test |
M. Smith, Shang |
Stored beam |
1100-1300 |
Continue booster BPM reponse measurement |
Yao |
Occasion injection |
1300-1700 |
S27 4x4 test studies |
Sereno et al |
Stored beam & injection |
1700-2100 |
Evaluating detector to measure centroid and beam size at 1 BM (Shutters permit needed) |
Emery, IBM |
Stored beam & injection |
2100-2400 |
injection/dynamic aperture study |
Sajaev |
Stored beam & injection |
|
Wednesday, March 2, 2016 |
|
|
0000-0100 |
injection/dynamic aperture study (continued) |
Sajaev |
Stored beam & injection |
0100-0630 |
injection study |
Xiao |
Stored Beam & injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |