Machine Studies

Draft Schedule for Run01-5, 2016

February 29th 0800 – March 2nd 0800



Time

Descriptions

Studiers

SR Status


Monday, February 29, 2016



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Coupling effect on lifetime w/ users

Emery

Stored Beam & Injection

0900-1200

Booster long ramp studies

Yao

Limited/No Injection

1000-1030

Reboot interleaving DSPs

PS group

No Injection

1000-1030

Add Metasys PVs

Smith, M.

Stored Beam & Injection

1000-1030

Switch over pumps 523, 525 and 531

Wright

No Beam

1000-1200

Investigate 7ID scanning issues

Smith, M.

Stored Beam & Injection

1000-1200

During studies, investigate noisy reading on S3B:P3.

Brill

No beam

1000-1200

Swap S28:29 quads for IGBT upgrade

Ackley

No Beam

1000-1200

Investigate Cap/OT trip in S25A:S4

Vargas

No Beam

1000-1200

Replace GESPAC crate in S28 cab 5

Jordan

No Beam

1000-1200

L2 envelop detector calibration

Smith, T.

No Injection

1200-1400

re-measure booster charge dependent tune shift. Booster beam only

Yao

No injection

1400-1800

Evaluating detector to measure centroid and beam size at 1 BM - Part 1 (Shutters permit needed)

Emery, IBM

Stored beam & injection

1800-2300

set up hybrid lattice

Sajaev

Stored beam & injection

2300-2400

Orbit switch

Xiao

Stored beam & injection


Tuesday, March 1, 2016



0000-0300

Orbit switch (continued)

Xiao

Stored beam & injection

0300-0500

Measure offset for 12B:P1 and S27B:P2

Xiao

Stored beam

0300-0700

PC Gun studies

Yine Sun, Dooling

No injection

0700-1100

linac beam and rf power studies

Pasky, Yine Sun

Limited injection

0900-1100

Automatic steering debugging

Shang, M. Smith

No beam

1100-1300

Automatic steering test

M. Smith, Shang

Stored beam

1100-1300

Continue booster BPM reponse measurement

Yao

Occasion injection

1300-1700

S27 4x4 test studies

Sereno et al

Stored beam & injection

1700-2100

Evaluating detector to measure centroid and beam size at 1 BM (Shutters permit needed)

Emery, IBM

Stored beam & injection

2100-2400

injection/dynamic aperture study

Sajaev

Stored beam & injection


Wednesday, March 2, 2016



0000-0100

injection/dynamic aperture study (continued)

Sajaev

Stored beam & injection

0100-0630

injection study

Xiao

Stored Beam & injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection