Machine Studies
Draft Schedule for Run01-6, 2016
March 9th 0800 – March 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, March 9, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Swap out quads in S24/25 for IGBT upgrade |
Ackley/Jordan |
No Beam |
0930-1130 |
Investigate Capt/OT trip in S25A:S4 |
Vargas |
No Beam |
0930-1200 |
Reboot siocblops and multiple ID iocs |
M. Smith |
No Beam |
0930-1130 |
Booster long ramp test (No booster injection) |
Yao |
No Injection |
0930-1200 |
Continue Linac beam studies |
Pasky |
Limited injection |
1200-1300 |
P0 feedback control software test (hybrid or single bunch) |
Yao, Shang |
Stored beam & injection |
1300-1500 |
booster charge dependent tune shift measurement |
Yao |
Limited injection |
1300-1500 |
Automated steering test |
Shang, M. Smith |
Stored beam |
1500-1700 |
investigate booster new BPM low response problem. Booster beam. |
Yao, Pietryla, Bui |
Occasional inj. possible |
1500-1900 |
S27 feedback studies |
Sereno, et al |
Stored beam & occ. injection |
1700-1900 |
PAR streak camera testing |
Calvey, Yao, Harkay, Yang |
Occasional inj. possible |
1900-2200 |
Xbpm Mombo data collection (top-up needed) |
Hahne |
Stored beam & injection |
2200-2400 |
PC Gun Studies |
Yine Sun, Dooling |
No injection |
|
Wednesday, March 10, 2016 |
|
|
0000-0400 |
PC Gun Studies (continued) |
Yine Sun, Dooling |
No injection |
0400-0700 |
Abort kicker studies with hybrid mode |
Harkay, Dooling |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |