Machine Studies
Draft Schedule for Run01-7, 2016
March 15th 0800 – March 16th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, March 15, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Switch from RF3 to RF2 |
RF Group |
No Beam |
0930-1030 |
Switch over pumps 501, 505 & 509 |
Wright |
No Beam |
0930-1130 |
Swap out quads in S30/31 for IGBT upgrade |
Ackley/Vargas |
No Beam |
0930-1130 |
Troubleshoot L1:RG1:SM1:HZ |
Donkers |
No Beam |
0930-1130 |
Booster long ramp test |
Yao |
No Injection |
1000-1100 |
Replace S38 IR thermometer |
Wright |
Access Zone F |
1000-1200 |
Fix S35 GRID Xbpm |
MOM |
Access Zone F |
1100-1300 |
Investigate drifting gap voltage |
RF Group |
No Beam 1 hr/ Stored Beam & Injection 1 hr |
1300-1500 |
Automated steering tests |
Emery, Shang |
Stored beam & occ. injection |
1300-1500 |
continue booster BPM troubleshooting and response measurement |
Yao, Bui, Pietryla |
Occasion injection |
1500-1600 |
test P0 feedback sample pattern scan script |
Yao, Shang |
Stored beam & injection |
1600-2000 |
4X4 feedback controller testing |
Sereno |
Stored beam & occ. inj. |
1600-1800 |
PAR streak camera testing |
Yao, Harkay, Calvey, Yang |
Occasion injection |
2000-2400 |
Abort kicker studies |
Harkay, Dooling, Emery |
Stored beam & inj. |
|
Wednesday, March 16, 2016 |
|
|
0000-0400 |
Orbit switch |
Xiao |
Stored beam & injection |
0400-0630 |
TBA |
Xiao |
Stored beam & injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |