Machine Studies

Draft Schedule for Run02-1, 2016

May 24th 0800 – June 1st 0800

Time

Descriptions

Studiers

SR Status


Monday, May 23, 2016



0800-1000

Store first beam & MPS live tests

OPS

Stored Beam& Injection

1000-1400

ID4 aperture measurement (<30 mA)

Emery/Y.P.Sun

Stored Beam& Injection

1400-1500

SCU0/SCU1 beam-based alignment

25 mA, 24 bunches

Harkay

Stored Beam& Injection

1500-2400

RF conditioning with beam (9 hours)

OPS

Stored Beam& Injection


Tuesday, May 24, 2016



0000-1200

RF conditioning with beam (12 hours)

OPS

Stored Beam& Injection

1200-1600

BPLD validations

Erwin

Stored Beam& Injection

1600-2000

X-ray BPM sanity check

Hahne

Stored Beam& Injection

2000-2400

BPM/feedback system checkout

Sereno

Stored Beam& Injection


Wednesday, May 25, 2016



0000-0400

Initial lattice setup

Sajaev

Stored Beam& Injection

0400-0800

Orbit recovery

Xiao

Stored Beam& Injection

0800-1000

BPM offset measurement

Xiao

Stored Beam& Injection

1000-1400

Install extra radiation shielding to PAR

MOM

Access PAR

1000-1030

Prepare for SR RF waveguide switch and access into Zone F

OPS

No beam

1030-1130

SR RF waveguide switch to RF2 providing

RF Group

No beam

1030-1130

Replace S38 Cav 1 upstream & downstream IR detectors

Pace/McKenzie

Zone F access

1400-1800

Online-MOGA optimization

Y.P. Sun

Stored Beam& Injection

1800-2000

Check error messages from steering alarm handler

Fystro

Stored Beam& Injection

2000-2400

Sector 27 unified feedback studies

Sereno

Stored Beam& Injection


Thursday, May 26, 2016



0000-0800

Open



0800-0900

PSS end to end tests

Budz

No Beam

0800-1200

Calibrate L2 vswr circuit

RF Group

No injection

1200-1230

Recover injectors

OPS

Stored Beam& Injection

1230-1500

PAR radiation survey

Yao/Vacca

Limited Injection

1500-1900

Booster new BPM test

Yao/Shang/Bui/Pietryla

Limited Injection

1600-2400

CPU checkup and correction I

Xiao

Limited Injection


Friday, May 27, 2016



0000-0400

Re-calibrate ID1 BLM

Dooling/Harkay

Stored Beam& Injection

0400-0500

OPEN



0500-0800

ID4 aperature scan

Yipeng Sun

Stored Beam & Injection

0800-1200

L4 rf study

RF group

No Beam

1200-1600

Sector 27 unified feedback studies

Sereno

Stored Beam& Injection

1600-2000

Troubleshoot Booster Current Monitor

Yao/Shang

Limited Injection

2000-2400

Booster 132nm efficiency study

Yao/Shang

Limited Injection

2000-2400

CPU checkup and correction II

Xiao

Limited Injection


Saturday, May 28, 2016



0000-0200

CPU checkup and correction II (cont)

Xiao

Limited injection

0200-0600

Open



0600-1000

Online MOGA optimization

Yipeng Sun

Stored beam & injection

1000-1600

PAR RF studies

Calvey, Berenc, Borland

Limited injection

1600-2400

IEX checkup and correction I

Xiao

Stored Beam& Injection


Sunday, May 29, 2016



0000-0800

Open



0800-1600

132nm lattice studies

Yao/Borland

Limited injection

1600-2400

IEX checkup and correction II

Xiao

Stored Beam& Injection


Monday, May 30, 2016



0000-1000

Top-up verification

OPS

Stored Beam & Injection

1000-1800

ID4 aperature scan

Yipeng Sun

Stored Beam & injection

1800-2400

Top-up verification

OPS

Stored Beam & Injection


Tuesday, May 31, 2016



0000-0700

Top-up verification

OPS

Stored Beam & Injection

0700-1200

Final lattice and injection setup

Sajaev

Stored Beam & Injection

1200-1400

SCU0 skew quad FF checkout

Harkay

Stored Beam & Injection

1400-2200

Commission S6 GRID XBPM and PE XBPM

Sereno/Yang

Stored Beam & Injection

2200-2400

Final pinhole & bunch purity set-up

Yang

Stored Beam & Injection


Wednesday, June 1, 2016



0000-0100

Final pinhole & bunch purity set-up

Yang

Stored Beam & Injection

0100-0600

ID4 impedance measurement

Sajaev

Stored Beam & Injection

0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection