Machine Studies
Draft Schedule for Run02-10, 2016
August 1st 0800 – August 2nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, August 1, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Wavelength switch from RF3/4 to RF2/4 |
RF Group |
No Beam |
0930-1030 |
Check cavity photohelic gauge pressure |
RF Group |
No Injection |
0930-1030 |
Repair water leak in RF-5 garage |
RF Group |
No Injection |
0930-1130 |
Swap out sextupole PS for upgrade |
Ackley |
No Beam |
1000-1100 |
Investigate limit switch at 12ID |
Merritt |
Access Zone B |
1100-1110 |
Brief tour |
Gluskin |
Access Zone B |
1130-1200 |
Recover SR |
OPS |
Stored Beam & Injection |
1200-1400 |
Vertical acceptance measurement |
Borland |
Stored Beam & Injection |
1400-1900 |
Mombo scans and software testing |
Hahne/Shang |
Stored Beam & Injection |
1900-2300 |
6ID GRID study |
Yang |
Stored Beam & Injection |
2300-2400 |
S27 feedback study |
Sereno |
Stored Beam & Injection |
|
Wednesday, August 2, 2016 |
|
|
0000-0100 |
S27 feedback study |
Sereno |
Stored Beam & Injection |
0100-0630 |
High charge booster study |
Harkay/Yao/ Calvey, Berenc |
Limited Injection |
0100-0630 |
Setup HB Inj. lattice |
Xiao |
Limited Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |