Machine Studies

Draft Schedule for Run02-4, 2016

June 20th 0800 - June 21th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, June 20, 2016

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Troubleshoot Booster ramp errors

Xu/Yao/Fors/

Lenkszus

No Injection

0930-1130

Install modulator module RF-5

Berenc

No Injection

0930-1130

Evaluate L2 envelope detectors

RF Group

Limited Injection

0930-1130

Swap out quad PS for upgrade

Ackley

No Beam

0930-1130

Investigate S26B:V4 DAC readback

Vargas

No Beam

0930-1130

Inspect S:IS2 PS

Goetzen

No Beam

1000-1100

Replace S38 blower

MOM

Access Zone F

1130-1200

Recover SR injection

OPS

Stored Beam & Injection

1200-1400

PAR radiation survey

Yao/Vacca

No Injection

1400-1500

Install/Test BTS controllaw all corrector configuration

Yao/Shang

No Injection

1500-1600

L2 optimization

Ma/Pasky

No Injection

1600-1800

Linac optics

Borland

No Injection

1800-2200

S27 unified feedback study

Sereno

Stored Beam & Injection

2200-2400

ID4 local impedance measurement

Sajaev

Stored Beam & Injection

 

Tuesday, June 21, 2016

 

 

0000-0200

ID4 local impedance measurement

Sajaev

Stored Beam & Injection

0200-0700

Combined Booster/BTS/SR study

Yao/Emery/Xiao/Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection