Machine Studies

Draft Schedule for Run02-5, 2016

June 27th 0800 - June 29th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, June 27, 2016

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Waveguide switch

RF Group

No Beam

0930-1000

Reboot interleaving PS

PS Group

No Injection

0930-1130

Swap P0 feedback amplifier

Keane, Yao, Monte

No Beam

0930-1130

Swap out quad PS for upgrade

Ackley

No Beam

0930-1130

Investigate S26B:V4 DAC readback

Vargas

No Beam

0930-1130

Inspect S:IS2 PS

Goetzen

No Beam

1000-1300

Install beam loss monitor

Dooling, Diag

Access PAR

1000-1200

Install poly sheeting over lead shielding

Theres

Access PAR

1000-1200

PAR fundamental cavity measurements

Berenc

Access PAR

1000-1200

Investigate Booster startDigitizer error in 1Hz mode

Yao, Lenkszus

No Injection

1015-1200

Calibrate cables at L2,4 & 5

Goel

Access Linac

1100-1200

SCU measurements

Merritt

Access Zone A

1200-1400

Calibrate cables for Linac DMU racks

Goel

No Injection

1200-1400

Test RF5 gating

Berenc

No Injection

1200-1400

Troubleshoot L3:AM1 readback error

Donkers

Limited Injection

1400-1800

Setup Hybrid lattice

Sajaev

Stored Beam & Injection

1800-2000

Check P0 feedback system

Yao/Keane

Stored Beam & Injection

2000-2400

S27 unified feedback test

Sereno/Emery/Shang

Stored Beam & Injection

 

Tuesday, June 28, 2016

 

 

0000-0400

Orbit switch

Xiao

Stored Beam & Injection

0400-0800

High beta injection test

Xiao

Stored Beam & Injection

0800-1000

PAR radiation survey

Yao/Vacca

PAR beam

1000-1600

Tune up booster 132 nm lattice

Yao/Shang

Booster beam

1600-1800

Adjust L4 rf timing

Ma/Pasky/

Cours

Linac beam

1800-2200

Test SCU0 software in ID6

Sereno/Yang/

Xu

Stored Beam & Injection

2200-2400

Benchmark MOGA simulation

Y.P. Sun

Stored Beam & Injection

 

Wednesday, June 29, 2016

 

 

0000-0200

Benchmark MOGA simulation

Y.P. Sun

Stored Beam & Injection

0200-0630

Impedance measurement

Sajaev

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection