Machine Studies
Draft Schedule for Run02-9, 2016
July 25th 0800 – July 27th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 25, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
1000-1030 |
Reboot siocblops |
Smith |
Stored beam & Injection, No Dataloggers |
1000-1030 |
Reboot interleaving PS |
PS Group |
No Injection |
1000-1100 |
Investigate S34B:P5 ADC overflow error which will not clear |
Bui |
No beam |
1000-1200 |
Swap out quad PS for upgrade |
Ackley |
No Beam |
1030-1130 |
Investigate/Replace RF cavity blower in S40 |
Wright |
Access Zone F |
1030-1130 |
SCU measurements |
Kasa |
Access Zone A |
1200-1230 |
Recover SR ring |
OPS |
Stored Beam & Injection |
1230-1430 |
Measure radiation level with beam loss at BTX line fast kicker location |
Yao/Vacca |
Booster beam |
1430-1630 |
Vertical acceptance measurement |
Borland |
Stored Beam & Injection |
1630-1900 |
P0 feedback loop with 432 fill |
Yao/Shang |
Stored Beam & Injection |
1900-2200 |
Calibrate the ID1 BLM |
Harkay/ Dooling |
Stored Beam & Injection |
2200-2400 |
S27 Unified feedback |
Sereno |
Stored Beam & Injection |
|
Tuesday, July 26, 2016 |
|
|
0000-0200 |
S27 Unified feedback |
Sereno |
Stored Beam & Injection |
0200-0600 |
Orbit switch |
Xiao |
Stored Beam & Injection |
0600-0800 |
Test HB Inj. optics |
Xiao |
Stored Beam & Injection |
0800-0930 |
Waveguide switch to RF-1 |
RF Group |
No Beam |
0930-1130 |
RF-1 measurements with beam |
RF Group |
Stored beam & Injection |
1130-1630 |
MOMBO gap scan and S27 GRID FF update table |
Hahne/Schroeder/Shang |
Stored beam & Injection |
1630-2030 |
6ID software/commissioning |
Yang/Xu |
Stored beam & Injection |
2030-2230 |
Calibrate the fast beam loss monitor in the PAR |
Dooling/Yao |
PAR beam |
2230-2400 |
Test optimized vertical DA optics |
Emery |
Stored beam & Injection |
|
Wednesday, July 27, 2016 |
|
|
0000-0530 |
Test optimized vertical DA optics |
Emery |
Stored beam & Injection |
0530-0630 |
Waveguide switch to RF-4 |
OPS/RF Group |
No Beam |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |