Machine Studies

Draft Schedule for Run03-10, 2016

December 12th 0800 – December 13th 0800



Time

Descriptions

Studiers

SR Status


Monday, December 12, 2016



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

L3 modulator response time measurements

Pietryla

No Impact

0930-1130

Thermal scan converters Zone B

Puttkammer

No Beam

1000-1100

Sector 7 piping evaluation

Theres

Access Zone A

1000-1100

Switch Pump 303 to back-up (Supplies DI water to the north side of the booster) NOT bumpless

Wright

No Booster beam

1200-1300

test dsp software on iocs37fb and iocs39fb with beam

Xu

Stored beam

1300-1700

measure ID4 impedance

Sajaev

Stored beam & injection

1700-1900

Longitudinal CBI studies with Dimtel instrumentation. 100 mA, 324 and 24 bunches.

Harkay, Emery, Berenc, Wienands

Stored beam & injection

1900-2400

IBS studies in S27

Sereno, et al

Stoed Beam & Occ. Inj.


Tuesday, December 13, 2016



0000-0100

IBS studies in S27(continued)

Sereno

Stoed Beam & Occ. Inj.

0100-0500

check CPU alignment

Xiao

Stored beam & Occ. Inj.

0500-0700

workstation orbit correction with filter coefficients for Smith Predictor

Emery

Stored Beam & Occ. Inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection