Machine Studies
Draft Schedule for Run03-4, 2016
October 24th 0800 – October 25th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 24, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
1000-1100 |
Inspect VME modules in iocmtime (iocmtime will be powered off) |
Arnold |
No Beam/ No Injection |
1000-1100 |
Waveguide switch to RF-1 |
RF Group |
No Beam |
1000-1100 |
re programming the LNDS main PLCs |
M. Smith |
No Beam |
1000-1200 |
Fix by some work around the SCU6 feedforward/setpoint values transitioning from datapool vector mode to scalar mode |
Emery |
No Beam |
1000-1100 |
Troubleshoot iocs27abpm event trigger |
Bui |
No Beam |
1000-1100 |
Update PLC program for RFG water station |
Wright |
No Injection |
1000-1200 |
Test L4 SSA interface |
Ma |
Limited Injection |
1000-1200 |
Investigate problem at S40B:V4 |
Wang |
No Beam |
1000-1200 |
Swap and test fast correctors at S27 |
Wang |
No Beam |
1000-1200 |
Swap sextupole converters Zone F/E |
Vargas |
No Beam |
1015-1030 |
Reboot MPS ioc |
Smith |
No Beam |
1200-1500 |
booster radiation survey for loss scenarios 1-3 -- Store 24 singlets before study starts |
Yao, Vacca |
No injection |
1200-1230 |
realign 11 BM and put in back into datapool |
Hahne/Sereno |
Stored beam |
1230-1430 |
FPGA bpm timing adjustment and put more bpms into vertical datapool |
Sereno |
Stored beam |
1500-1530 |
Waveguide switch to RF-4 |
RF Group |
No Beam |
1530-1900 |
Integrated beam stability studies |
Sereno, et all |
Stored beam & injection |
1900-2200 |
GRID Xbpm studies |
Yang, Sereno |
Stored Beam & injection |
2200-2400 |
Measure SCU6 perturbations with beam using SR correctors |
Emery |
Stored Beam & injection |
|
Tuesday, October 25, 2016 |
|
|
0000-0400 |
Adjust timing/amplitude of kickers |
Emery |
Stored Beam & injection |
0400-0500 |
Measure fields when SCU6 is quenched with heater |
Emery |
Stored Beam & injection |
0500-0700 |
Finish some details of ID6 aperture scan |
Emery |
Stored Beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |