Machine Studies
Draft Schedule for Run03-5, 2016
October 31st 0800 – November 2nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 31, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap scans |
Schroeder |
Stored |
0930-1030 |
Condition (force condition dipole, quads, sextupoles) and refill SR with kicker settings from before 10/24 beam loss |
Schroeder |
Stored Beam & Injection |
1030-1130 |
Waveguide switch to RF-2 |
RF Group |
No Beam |
1030-1230 |
test fix for RTFB set point while datapool is running |
Emery, Fors, Shifu |
No beam |
1030-1130 |
Update Linac modulator pump controller |
Wright |
No Injection |
1030-1200 |
Investigate IS1 & IS2 on/off function |
Goetzen |
No Beam |
1030-1130 |
Switch to primary pumps 513 & 524 (affects S15&16, S25&26) P.S. set to zero |
Wright |
No Beam |
1030-1230 |
Swap sextupole converters Zone E |
Ackley |
No Beam |
1030-1230 |
Investigate S40B:V4 PS |
Vargas |
No Beam |
1030-1230 |
Troubleshoot S6C:H1 readback |
Jordan |
No Beam |
1230-1300 |
Recover SR |
OPS |
Stored Beam & injection |
1300-1600 |
Investigate injection efficiency problems |
Sajaev, Emery |
Stored beam & injection |
1600-2000 |
Set-up hybrid lattice |
Sajaev |
Stored beam & injection |
1600-1800 |
Set up P0 feedback for hybrid (parallel to lattice set-up) |
Yao |
Stored beam & injection |
2000-2400 |
Orbit switch |
Xiao |
Stored beam & injection |
|
Tuesday, November 1, 2016 |
|
|
0000-0400 |
Studies TBD |
Xiao |
Stored beam & injection |
0400-0700 |
Measuring beam loss similar to ACIS/PSS trips |
Harkay, Dooling |
Stored beam & injection |
0700-0800 |
Measure fields when SCU6 is quenched with heater |
Emery |
Stored beam & injection |
0800-0900 |
Finish some details of ID6 aperture scan |
Emery |
Stored beam & injection |
0900-1300 |
set up a 6 GeV lattice for measuring HOMs |
Emery, Sajaev, Yao |
Stored beam & Injection |
1300-1500 |
test steering setup for BTX kicker deflection measurement |
Yao |
No injection |
1500-1900 |
sector 27 integrated beam stability studies |
Sereno, et al |
Stored beam & Occ. injection |
1500-1900 |
configure Booster new BPMs and orbit response measurement |
CY Yao, T. Pietryla, H. Shang |
Occasional injection possible |
1900-2300 |
6 ID GRID Xray bpm studies |
Sereno, Yang |
Stored beam & injection |
2300-2400 |
Booster injection studies |
Calvey |
Booster beam |
|
Wednesday, November 2, 2016 |
|
|
0000-0100 |
Booster injection studies (continued) |
Calvey |
Booster beam |
0100-0300 |
SCU1 perturbation correction |
Emery |
Stored beam & injection |
0300-0700 |
Smith predictor in Datapool test |
Emery |
Stored beam & injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |