Machine Studies
Draft Schedule for Run03-7, 2016
November 14th 0800 – November 15th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 14, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Waveguide switch to RF1-3 |
RF Group |
No Beam |
0930-1030 |
Check motor rotation on SRVC 12 water station (will trip MPS) |
Wright |
No Beam |
0930-1130 |
Install LLRF DC PS at L3 |
RF Group |
Limited injection |
0930-1130 |
Replace RF2 T-R Set top oil temperature sensor |
RF Group |
No Beam |
0930-1130 |
Swap sextupole converters in Zone A & E |
Ackley |
No Beam |
0930-1130 |
Thyratron measurements in SR IK3/IK1 Kicker power supply |
Vanis |
No Beam |
0930-1130 |
L1 driver calibration |
RF Group |
No Injection |
1000-1100 |
Access into Zone A to remove spare ID vacuum chamber (super door open) |
Hoyt |
Zone A access |
1130-1200 |
Reover SR/Injectors |
OPS |
Stored Beam & Injection |
1200-1500 |
test the new installed Booster BSP-100 BPMs and take response data. Booster beam. |
Yao, Bui, Pietryla, Shang. |
Occasional injection possible |
1200-1500 |
Sector 27 IBS studies |
Sereno, et al |
Stored beam & Occ. injection |
1500-1800 |
6ID GRID studies |
Sereno, Yang |
Stored beam & injection |
1800-2200 |
4-ID aperture measurement |
Sajaev, Emery |
Stored beam & injection |
2200-2400 |
Orbit switch to 324 singlets |
Xiao |
Stored beam & injection |
|
Tuesday, November 15, 2016 |
|
|
0000-0200 |
Orbit switch to 324 singlets (continued) |
Xiao |
Stored beam & injection |
0200-0600 |
4-ID impedence measurement |
Sajaev, Emery |
Stored beam & inj. |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |