Machine Studies
Draft Schedule for Run03-9, 2016
December 5th 0800 – December 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, December 5, 2016 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1030 |
Vacuum leak check by closing valves |
Gagliano |
No Beam |
0930-1130 |
Evaluate PAR RF-1 drive amp |
RF Group |
No Injection |
0930-1000 |
Initial check of IS1 (repairs will continue without power during the Zone F access) |
Goetzen |
No injection |
0930-1130 |
Replace LLRF DCPS chassis at L3 |
RF Group |
No injection |
0930-1130 |
Swap BS2 sextupole converters Zone A/F |
Ackley |
No Beam |
1000-1100 |
Sector 7 piping inspections |
Merritt, MOM |
Access Zone A |
1000-1200 |
Investigate/repair BSS8 in Zone A |
Belcher |
Access Zone A |
1000-1300 |
bumpless FF corrector PVs. no SR beam using p.s. not in Zone A or F |
Xu, Fors, Emery |
No beam |
1030-1430 |
Leak check in Zone F |
Gagliano |
Access Zone F |
1200-1300 |
Measure bellows upstream of L2:AS2 |
Bromberek |
Access Linac |
1300-1400 |
Test feedforward in S6 |
Shang |
No beam |
1330-1430 |
investigate Linac modulator (L3) high voltage response times |
Pietryla |
No impact |
1430-1500 |
Recover storage ring to verify injection and stored beam (co-ordinated with below) |
OPS |
Stored Beam & injection |
1500-1600 |
Continue troubleshoot SR IS1 intermittent fault (if necessary) |
Goetzen |
No Beam |
1500-1600 |
Mechanical motion (if above not needed) |
Sereno, Shang |
Stored Beam |
1600-1700 |
Apeterture scan |
Emery |
Stored Beam & Injection |
1700-1800 |
324 bunch instability measurement with Berkley equipment |
Harkay, Berenc, Emery |
Stored Beam & Injection |
1800-2100 |
Booster high-charge studies with cavity detuning at 6 GeV |
Harkay, Berenc, Calvey |
No SR injection |
1800-2100 |
sector 27 IBS studies (324 singlets, no injection) |
Sereno, et al |
Stored beam |
2100-2400 |
Switch orbit to 24 singlets |
Xiao |
Stored beam & injection |
|
Tuesday, December 6, 2016 |
|
|
0000-0100 |
Switch orbit to 24 singlets |
Xiao |
Stored beam & injection |
0100-0400 |
Hybrid checkout |
Sajaev |
Stored beam & injection |
0400-0700 |
Smith predictor on datapool |
Emery |
Stored beam |
0500-0700 |
test interleaving magnet bucking coil operation |
Dooling |
Occ. Inj. possible |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |