Machine Studies

Draft Schedule for Run01-13, 2017

April 25th 0000 – April 26th 0000



Time

Descriptions

Studiers

SR Status


Tuesday, April 25, 2017



0000-0010

Collect XBPM orbit data

OPS

Stored Beam & Injection

0010-0400

Setup HSCU

Sajaev

Stored Beam & Injection

0400-0800

Booster orbit correction and BPM measurement

Calvey/Emery/Shang

No Injection

0800-1000

Install and test BTS:RSR

Vanis

No Injection

1000-1400

24-ID Compton XBPM and 6-ID GRID XBPM study

Yang

Limited Injection

1400-1800

S27 Integrated Beam Stability Study

Carwardine, et al.

Limited Injection

1000-1800

BTX Kicker measurement

Carwardine/Wang/Sun/Xiao

Limited Injection

1800-2200

Prepare orbit for next run

Xiao

Stored Beam & Injection

2200-2400

Gentle shutdown

OPS

No Beam