Draft Schedule for Run01-5, 2017

February 27th 0800 – March1st 0800



Time

Descriptions

Studiers

SR Status


Monday, February 27, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1000

Reboot interleaving DSPs

OPS

No Injection

0930-1000

Switch pumps 509 & 523

Wright

No Beam

0930-1130

Fix standby pump for pump 902

Wright

No Beam/ No RF

0930-1030

Install splitters B107 for P3P4 and P3P1

Brill

No Beam

0930-1130

Swap out sextupoles for upgrade

Vargas

No Beam

0930-1130

Investigate why BTS:AQ3 is alarming

Vanis

No Beam

0930-1130

Troubleshoot S16C:H1

Jordan

No Beam

0930-1200

Modify LTP:Q10 and L1:RG1:QM4

Donkers

No Injection

1000-1100

Run cable for RadiaBeam test

Hoyt

Access Linac

1200-1230

Recover injectors/SR

OPS

Stored Beam & injection

1230-1300

verify orbit correction still works in the PAR after splitter installation

Sereno/Pasky

No injection

1300-1700

RTFB/Datapool unified feedback steering test

Sereno

Stored beam

1330-1530

RG2 interleaving lattice study

Yin-E Sun

No injection

1530-1930

Booster tune studies

Harkay, Calvey, Shang

No injection

1530-1730

look at loss monitor signals in PAR (parasitic to Booster tune studies)

Dooling, Keane

No injection

1930-2230

PAR high charge studies (1 Hz)

Harkay, Calvey

No injection

2230-2400

setup hybrid lattice

Sajaev

Stored beam & injection


Tuesday, February 28, 2017



0000-0230

setup hybrid lattice (continued)

Sajaev

Stored beam & injection

0230-0630

Orbit switch

Xiao

Stored beam & injection

0800-1200

Booster high charge studies (1 Hz), cavity detuning

Harkay, Calvey, Berenc

No injection

1200-1400

retake clean HOM data from single bunch beam. (after hybrid mode set up)

Emery

Stored beam & injection

1400-1900

Booster orbit correction

Sajaev, Emery, Shang

Limited injection

1900-2200

test corrector feedforward for ID gaps.

Emery, Shang

Limited injection

2200-2400

PC gun checkout

Yin-E Sun

No injection


Wednesday, March, 2017



0000-0200

PC gun checkout (continued)

Yin-E Sun

No injection

0200-0600

TBD

Xiao

Stored beam & injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection