Machine Studies

Draft Schedule for Run01-6, 2017

March 6th 0800 – March 7th 0800



Time

Descriptions

Studiers

SR Status


Monday, March 6, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1030

SCU functional tests

Smith

No Beam

0930-1030

Install booster bpm database

Pietryla

Limited Injection

0930-1130

Swap out sextupoles for upgrade

Vargas

No Beam

0930-1130

Modify LTP:Q10 & L1:RG1:QM4

Donkers

No Injection

0930-1130

Swap S40 quads

Puttkammer

No Beam

1000-1200

Troubleshoot PTB triple stop

Gagliano

Access PAR

1200-1230

Recover SR (inject 324)

OPS

Stored Beam & Injection

1230-1830

Integrated beam stability study

Sereno et al.

Limited Injection

1230-1530

Booster orbit correction

Sajaev/Emery/Shang

Limited Injection

1530-1830

Booster tuning studies

Harkay/Calvey

Limited Injection

1830-2130

1 Hz PAR beam size measurement

Calvey/Sereno/Brill

No Injection

1830-2130

Test ID FF (324)

Emery/Shang

No Injection

2130-2400

On-axis injection to small DA optics

Xiao

Stored Beam & Injection


Tuesday, March 7, 2017



2400-0300

On-axis injection to small DA optics

Xiao

Stored Beam & Injection

0300-0700

High beta lattice study

Yipeng Sun

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection