Draft Schedule for Run01-7, 2017
March 13th 0800 – March 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 13, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1000 |
Reboot booster bpm soft ioc |
Pietryla |
Limited Injection |
0930-1030 |
Check out process water pump 523 |
Wright |
No Beam |
0930-1130 |
Troubleshoot S25A:H3 |
Jordan |
No Beam |
0930-1130 |
Investigate PTB:Q9 |
Vanis |
Limited Injection |
0930-1130 |
Swap out sextupoles for upgrade |
Vargas |
No Beam |
0930-1130 |
Investigate L3 quads |
Donkers |
No Injection |
0930-1130 |
Swap S40 quads |
Puttkammer |
No Beam |
1000-1100 |
Investigate ion pump cable |
Hoyt |
Access Zone B |
1000-1200 |
S28 vibration measurements |
Preissner |
Access Zone D |
1200-1230 |
Recover SR (324) |
OPS |
Stored Beam & Injection |
1230-1300 |
Verify PAR orbit correction |
Harkay |
Limited Injection |
1300-1900 |
Integrated beam stability study |
Sereno et al. |
Stored Beam & Injection |
1900-2100 |
HOM data collection |
Emery |
Stored Beam & Injection |
2100-2400 |
Orbit Switch |
Xiao |
Stored Beam & Injection |
|
Tuesday, March 14, 2017 |
|
|
0000-0100 |
Orbit Switch |
Xiao |
Stored Beam & Injection |
0100-0500 |
Small DA on-axis injection |
Xiao |
Stored Beam & Injection |
0500-0700 |
Test Comptom X-ray BPMs at 24-ID (shutters open) |
Yang |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |