Machine Studies
Draft Schedule for Run02-1, 2017
May 23rd 0800 – May 31st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, May 22, 2017(Pre-studies) |
|
|
0900-1100 |
Prepare & store beam (MPS validation with beam) |
OPS |
Stored Beam & injection |
1100-1300 |
HSCU Test Chamber Commissioning at low current (<25mA) |
Yipeng Sun, Harkay, Emery |
Stored Beam & injection |
1300-2400 |
RF Conditioning with Beam |
OPS |
Stored Beam & injection |
1300-2400 |
Measure tunes and recover lifetime at 5mA intervals (for HSCU Test chamber commissioning) (Actually started 21:15 on 5/22) |
OPS |
Stored Beam & injection |
|
Tuesday, May 23 |
|
|
0000-1400 |
RF conditioning with beam (8 hours) |
OPS |
Stored Beam& Injection |
0000-1400 |
Measure tunes and recover lifetime at 5mA intervals (for HSCU Test chamber commissioning) |
OPS |
Stored Beam & injection |
1400-1500 |
Inject 324 singlets as part of HSCU Test chamber commissioning (102mA) |
Harkay/Sun/Emery |
Stored Beam & injection |
1500-1900 |
BPLD validations |
Hahne/Erwin |
Stored Beam& Injection |
1900-2200 |
X-ray BPM sanity check |
Hahne |
Stored Beam& Injection |
2200-2400 |
Recover orbit |
Xiao |
Stored Beam & injection |
|
Wednesday, May 24, 2017 |
|
|
0000-0300 |
Recover orbit |
Xiao |
Stored Beam & injection |
0300-0700 |
CPU checkout (Xiao will leave instructions) |
OPS |
Stored Beam |
0700-1000 |
ID4 aperature and impedance routine measurements |
Emery |
Stored beam & injection |
1000-1200 |
workstation SR orbit sddscontrollaw with filters |
Emery, Shang |
Stored beam & injection |
1300-1700 |
ID-7 aperture measurement |
Yipeng Sun |
Stored beam & injection |
1700-2000 |
Test PAR streak camera operation in 1 Hz mode. Measure bunch length during accumulation |
Harkay Calvey Lumpkin |
Limited injection |
1700-2200 |
RTFB/Datapool Unified feedback studies testing/software development |
Sereno, et al |
Stored beam & Injection |
|
Thursday, May 25, 2017 |
|
|
0000-0200 |
RTFB/Datapool Unified feedback studies testing/software development |
Sereno, et al |
Stored beam & Injection |
0200-0600 |
Check-out 24 bunch top-up and HSCU test chamber temps (before cooling clamp) |
OPS |
Stored beam & injection |
0600-0830 |
Interleaving checkout |
Yin-e Sun |
No injection |
0730-1230 |
Add cooling collar to 7ID HSCU test chamber downstream transition |
MOM group |
Zone A Access |
0800-0900 |
Replace IR detector S38, Cav. 1 DS |
Pace, McKenzie, Putnam |
Zone F Access |
0800-0900 |
Investigate Klixon on S38B:V3 |
Pace, McKenzie, Putnam, Puttkammer |
Zone F Access |
0830-1230 |
laser alignment |
Dooling |
Linac Access |
1000-1100 |
SR RF waveguide switch |
RF Group |
No beam |
1230-1330 |
Recover SR & injectors |
OPS |
Stored beam & injection |
1400-1800 |
Check-out 24 bunch top-up and HSCU test chamber temps (after cooling clamp) |
Harkay/OPS |
Stored beam & injection |
1800-2100 |
accumulation limit |
Emery |
Stored beam & injection |
2100-2400 |
setup lower energy SR for Intrabeam scattering investigation |
Emery |
Stored beam & injection |
|
Friday, May 26, 2017 |
|
|
0000-0400 |
IEX checkout (Xiao will leave instructions) |
OPS |
Stored beam & injection |
0400-0600 |
Operator training (Linac) |
OPS |
No injection |
0600-0800 |
OPEN |
|
|
0800-1200 |
Investigate lifetime and injection efficiency |
Yipeng Sun |
Stored beam & injection |
1200-1700 |
PAR high-charge studies vs RF params; measure bunch length (PD) and BPMs |
Harkay Calvey Yao Dooling Berenc) |
Stored beam & injection |
1700-2100 |
Check-out of +4 chromaticity |
Sajaev, Emery, Yipeng Sun |
Stored beam & injection |
2100-2400 |
Updated Test Orbit Controllaw Configuration Top-up Operations Check-out |
OPS |
Stored Beam & injection |
|
Saturday, May 27, 2017 |
|
|
0000-0800 |
Updated Test Orbit Controllaw Configuration Top-up Operations Check-out (continued) |
OPS |
Stored Beam & Injection |
0800-1200 |
Continued check-out of +4 chromaticity, injection efficiency |
Sajaev, Xiao |
Stored Beam & Injection |
1200-1800 |
IEX & CPU Correction (if needed)BTS set-up |
Xiao |
Stored Beam & injection |
1800-2400 |
Top-up Operations Check-out |
OPS |
Stored Beam & Injection |
|
Sunday, May 28, 2017 |
|
|
0000-0800 |
Top-up Operations Check-out |
OPS |
Stored Beam & Injection |
0800-1200 |
26-ID Compton XBPM studies: system check out and IOC program check out |
Yang |
Stored Beam & Injection |
1200-1800 |
BTS set-up |
Harkay, Emery |
Stored beam & injection |
1800-2400 |
PAR RF FF table seteup |
Harkay |
Limited injection |
|
Monday, May 29, 2017 |
|
|
0000-0400 |
OPEN |
|
|
0400-1200 |
6-ID GRID studies: calibration and, possibly, feedback test. |
Yang |
Stored Beam & injection |
1200-1600 |
PCG checkout with interleaving |
Yin-e Sun |
No injection |
1600-1800 |
RG1 checkout |
Yin-e sun |
No injection |
1800-2400 |
OPEN |
|
|
|
Tuesday, May 30, 2017 |
|
|
0000-0600 |
OPEN |
|
|
0600-0700 |
Replace dump relay and fuse in Raw P.S. T3 in S18/19 |
Puttkammer |
No beam |
0600-0800 |
Repair/replace thyratron in IK1 |
Puttkammer |
No beam |
0800-1300 |
Final lattice set-up |
Sajaev |
Stored beam & injection |
1300-1500 |
Response matrix measurement accuracy study |
Sajaev |
Stored beam & injection |
1500-1800 |
Final orbit checkout |
Xiao |
Stored beam & injection |
1500-1900 |
Pinhole camera & bunch puritycheckout/setup |
Yang |
Stored beam & injection |
1900-2100 |
26-ID Compton XBPM studies: performance study |
Yang |
Stored beam & injection |
2100-2400 |
OPEN |
|
|
|
Wednesday, May 31, 2017 |
|
|
0000-0630 |
OPEN |
|
|
0630-0800 |
Prepare for start of User Operations |
Stored beam & injection |
OPS |