Draft Schedule for Run02-2, 2017
June 5th 0800 - June 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 05, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-1130 |
Take output bridge current measurements |
Vargas |
No Beam |
0930-1130 |
Swap sextupoles for upgrades |
Ackley |
No Beam |
0930-1030 |
Replace MPC in sector 27 relay rack. |
Martens |
No Beam |
1000-1100 |
Install temperature sensors |
Erwin |
Access Zone D |
1000-1100 |
Check E-stop for S27-ID |
Grimmer |
Access Zone D |
1000-1100 |
Linac console test |
Smith/Pasky |
No injection |
1000-1100 |
increase the Current Gain in the Booster ramp converter B3C0H by 20% to 25% |
Donkers |
No Booster beam |
1000-1300 |
Install MMS at S27 |
Blake |
Access Zone D |
1100-1200 |
Check connections for S27B:P0 and S28A:P0 |
Erwin |
Access Zone D |
1100-1300 |
PAR/Booster on-momentum injection study, requires change rf frequency, |
Yao, Lenkszus |
No Beam |
1300-1330 |
Recover SR |
OPS |
Stored beam |
1330-1500 |
Check the modulator HV connections on 1-4 (need to be off during check) |
Rf Group |
No injection |
1500-1600 |
Test tune measurement |
Shang |
Stored beam |
1600-1800 |
repeat some booster extraction bump characterization plus BTS |
Emery |
Occasional Injection |
1600-1800 |
Investigate S27B:P0 & S28A:P0 and restore to OC if possible |
Sereno |
Stored beam |
1800-2200 |
6 ID GRID calibration/feedback studies |
Yang, Sereno |
Stored beam & injection |
2200-2400 |
26ID Compton XBPM studies |
Yang, Sereno |
Stored beam & injection |
|
Tuesday, June 6, 2017 |
|
|
0000-0200 |
26ID Compton XBPM studies (continued) |
Yang, Sereno |
Stored beam & injection |
0200-0600 |
Booster high-charge studies in the corrected orbit (1-Hz) |
Harkay |
Occasional injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |